The use of advance demand information in a project-based supply chain

被引:37
作者
van Donselaar, K
Kopczak, LR
Wouters, M
机构
[1] Eindhoven Univ Technol, Dept Technol Management, NL-5600 MB Eindhoven, Netherlands
[2] Stanford Univ, Dept Ind Engn & Engn Management, Stanford, CA 94305 USA
关键词
advance demand information; project environment; supply chain;
D O I
10.1016/S0377-2217(99)00411-7
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In a project environment, a manufacturer is confronted with two types of demand: regular demand from many small orders and very irregular, lumpy demand from infrequent, large orders. Manufacturers who build to stock must carry large safety stocks to meet the lumpy demand. As part of the project engineering process, however, project engineers and implementers (e.g. installers) typically have developed information about material requirements well in advance of placement of orders. We analyze the inventory reduction that could be achieved if the installer were to communicate advance demand information (ADI) to the manufacturer. We look at it in particular when the bid is placed. We focus on the following characteristics of available ADI in project environments: First, ADI information is uncertain, because decisions on installer and manufacturer selection have not yet been finalized. Second, information is detailed, available at the item level. We show that ADI is particularly valuable when potential demand for large projects is irregular and when proposals for potential projects have a high probability of leading to orders. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:519 / 538
页数:20
相关论文
共 18 条
[1]   Exploiting timely demand information to reduce inventories [J].
Bourland, KE ;
Powell, SG ;
Pyke, DF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 92 (02) :239-253
[2]   HIERARCHICAL PRODUCTION PLANNING FOR CONSUMER-GOODS [J].
DEKOK, AG .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 45 (01) :55-69
[3]  
EPPEN G, 1981, MULTI LEVEL PRODUCTI
[4]   Reducing the cost of demand uncertainty through accurate response to early sales [J].
Fisher, M ;
Raman, A .
OPERATIONS RESEARCH, 1996, 44 (01) :87-99
[5]  
FISHER ML, 1994, HARVARD BUSINESS MAY, P83
[6]   Customer-order information, leadtimes, and inventories [J].
Hariharan, R ;
Zipkin, P .
MANAGEMENT SCIENCE, 1995, 41 (10) :1599-1607
[7]  
KORNELIUS L, 1992, IFIP T B, V7
[8]   A model-based framework to overlap product development activities [J].
Krishnan, V ;
Eppinger, SD ;
Whitney, DE .
MANAGEMENT SCIENCE, 1997, 43 (04) :437-451
[9]   Accelerating product development by the exchange of preliminary product design information [J].
Krishnan, V ;
Eppinger, S ;
Whitney, DE .
JOURNAL OF MECHANICAL DESIGN, 1995, 117 (04) :491-498
[10]   Modelling the costs and benefits of delayed product differentiation [J].
Lee, HL ;
Tang, CS .
MANAGEMENT SCIENCE, 1997, 43 (01) :40-53