Simulation of demand side participation in Spanish short term electricity markets

被引:15
作者
Valencia-Salazar, I. [1 ]
Alvarez, C. [1 ]
Escriva-Escriva, G. [1 ]
Alcazar-Ortega, M. [1 ]
机构
[1] Univ Politecn Valencia, Inst Energy Engn, Valencia 46022, Spain
关键词
Demand response resources; Demand modelling; Electricity markets; Balancing services; Ancillary services;
D O I
10.1016/j.enconman.2011.02.005
中图分类号
O414.1 [热力学];
学科分类号
070201 [理论物理];
摘要
Demand response resources management is one of the most investigated solutions oriented to improve the efficiency in electricity markets. In this paper, the capability of customers to participate in short term markets is analyzed. An available methodology to analyze the daily and monthly energy consumptions of large customers is used to create energy offers and bids. This allows customers to participate in energy markets in order to buy, as first step, the usual electricity consumption and, additionally, to offer demand reductions in the short term electricity markets. Additionally, this paper shows the customer potential to participate in the Spanish electricity markets. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2705 / 2711
页数:7
相关论文
共 18 条
[1]
Technical and economical tools to assess customer demand response in the commercial sector [J].
Alvarez Bel, Carlos ;
Alcazar Ortega, Manuel ;
Escriva Escriva, Guillermo ;
Gabaldon Marin, Antonio .
ENERGY CONVERSION AND MANAGEMENT, 2009, 50 (10) :2605-2612
[2]
Assessment and simulation of the responsive demand potential in end-user facilities:: Application to a university customer [J].
Alvarez, C ;
Gabaldón, A ;
Molina, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (02) :1223-1231
[3]
A CLASS OF MODELS FOR LOAD MANAGEMENT APPLICATION AND EVALUATION REVISITED [J].
ALVAREZ, C ;
MALHAME, RP ;
GABALDON, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (04) :1435-1443
[4]
[Anonymous], SPANISH ELECT SYSTEM
[5]
[Anonymous], CONTROLLING MARKET P
[6]
ARRIAGA JLP, 2005, LIBRO BLANCO REFORMA
[7]
BRAITHWAIT S, 2002, ENCOURAGING DEMAND P
[8]
Demand elasticity increase for reducing social welfare losses due to transfer capacity restriction: A test case on Italian cross-border imports [J].
Bruno, S ;
De Benedictis, M ;
La Scala, M ;
Wangensteen, I .
ELECTRIC POWER SYSTEMS RESEARCH, 2006, 76 (6-7) :557-566
[9]
ESCRIVA G, 2009, P INT C REN EN POW Q
[10]
Goldman Charles A., 2002, LBNL50328 LBNL50328