Instrumentation and prototype measurements at the Zeebrugge rubble mound breakwater

被引:19
作者
Troch, P
De Rouck, J
Van Damme, L
机构
[1] State Univ Ghent, Dept Civil Engn, B-9052 Ghent, Belgium
[2] Minist Flemish Community, Coastal Div, B-8400 Ostend, Belgium
关键词
field data; prototype instrumentation; rubble mound breakwater; pore pressure; wave run-up;
D O I
10.1016/S0378-3839(98)00026-X
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The prototype monitoring system at Zeebrugge (Belgium), instrumented for the acquisition of field data on waves interacting with a rubble mound breakwater, is presented. To date, the monitoring system has been successfully put into operation and the acquired field data used for the calibration of physical and numerical models. The instrumentation and the data acquisition sections of the monitoring system are described. Experience of more than ten years is made available to those who deal with instrumentation in harsh maritime conditions. Two instrumentation systems are presented in more detail: pore pressure sensors for the measurement of internal pore pressures and stepgauges for the measurement of the wave run-up and run-down. Algorithms used for analysis of acquired field data are included. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:141 / 166
页数:26
相关论文
共 14 条
[1]  
ALLSOP NWH, 1985, SR2 HYDR RES
[2]  
AMOROS JR, 1996, P 11 INT HARB C ANTW
[3]  
BARENDS FBJ, 1988, DISCUSSION PAPER SIM
[4]  
Bird PAD, 1996, ADVANCES IN COASTAL STRUCTURES AND BREAKWATERS, P93
[5]  
BURGER W, 1988, P 21 ICCE MAL
[6]  
DeGirolamo P, 1996, ADVANCES IN COASTAL STRUCTURES AND BREAKWATERS, P64
[7]  
DEGROOT MB, 1994, P 24 INT C COAST ENG, V2, P1727
[8]  
HOWELL GL, 1989, P 21 COAST ENG C
[9]  
KINGSTON K, 1996, THEMATIC REPORT B DE
[10]   MOUND BREAKWATERS UNDER OBLIQUE WAVE ATTACK - A WORKING HYPOTHESIS [J].
LOSADA, MA ;
GIMENEZCURTO, LA .
COASTAL ENGINEERING, 1982, 6 (01) :83-92