An improved algorithm and solution on an integrated production-inventory model in a three-layer supply chain

被引:49
作者
Cardenas-Barron, Leopoldo Eduardo [1 ,2 ]
Teng, Jinn-Tsair [3 ]
Treviñio-Garza, Gerardo [2 ]
Wee, Hui-Ming [4 ]
Lou, Kuo-Ren [5 ,6 ]
机构
[1] Inst Tecnol & Estudios Super Monterrey, Sch Engn, Dept Ind & Syst Engn, Monterrey 64849, Nuevo Leon, Mexico
[2] Inst Tecnol & Estudios Super Monterrey, Sch Business, Dept Mkt & Int Business, Monterrey 64849, Nuevo Leon, Mexico
[3] William Paterson Univ New Jersey, Dept Mkt & Management Sci, Wayne, NJ 07470 USA
[4] Chung Yuan Christian Univ, Dept Ind & Syst Engn, Chungli 32023, Taiwan
[5] Dept Management Sci, Tamsui 251, Taipei, Taiwan
[6] Decis Making Tamkang Univ, Tamsui 251, Taipei, Taiwan
关键词
Production planning; Inventory control; Supply chain coordination; Joint economic lot sizing; EPQ; EOQ; SIZE;
D O I
10.1016/j.ijpe.2011.12.013
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Ben-Daya et al. (2010) established a joint economic lot-sizing problem (JELP) for a three-layer supply chain with one supplier, one manufacturer, and multiple retailers, and then proposed a heuristic algorithm to obtain the integral values of four discrete variables in the JELP. In this paper, we first complement some shortcomings in Ben-Daya et al. (2010), and then propose a simpler improved alternative algorithm to obtain the four integral decision variables. The proposed algorithm provides not only less CPU time but also less total cost to operate than the algorithm by Ben-Daya et al. (2010). Furthermore, our proposed algorithm can solve certain problems, which cannot be solved by theirs. Finally, the solution obtained by the proposed algorithm is indeed a global optimal solution in each of all instances tested. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:384 / 388
页数:5
相关论文
共 9 条