Resource scheduling using neural dynamics model of Adeli and Park

被引:123
作者
Senouci, AB
Adeli, H
机构
[1] Univ Qatar, Dept Civil Engn, Doha, Qatar
[2] Ohio State Univ, Dept Civil & Environm Engn & Geodet Sci, Columbus, OH 43210 USA
关键词
D O I
10.1061/(ASCE)0733-9364(2001)127:1(28)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a mathematical model for resource scheduling considering project scheduling characteristics generally ignored in prior research, including precedence relationships, multiple crew-strategies, and time cost trade-off. Previous resource scheduling formulations have traditionally focused on project duration minimization. The proposed model considers the total project cost minimization. Furthermore, resource leveling and resource-constrained scheduling have traditionally been solved independently. In the new formulation, resource leveling and resource-constrained scheduling are performed simultaneously. The proposed model is solved using the patented neural dynamics model of Adeli and Park. A case study is presented to demonstrate the performance of the method under various resource availability profiles.
引用
收藏
页码:28 / 34
页数:7
相关论文
共 30 条
[1]   OPTIMIZATION OF SPACE STRUCTURES BY NEURAL DYNAMICS [J].
ADELI, H ;
PARK, HS .
NEURAL NETWORKS, 1995, 8 (05) :769-781
[2]   Scheduling cost optimization and neural dynamics model for construction [J].
Adeli, H ;
Karim, A .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (04) :450-458
[3]  
Adeli H., 1996, Microcomputers in Civil Engineering, V11, P355
[4]  
Adeli H., 1998, Neurocomputing in Design Automation
[5]  
Adeli H., 1995, MACHINE LEARNING NEU
[6]  
Antill JM, 1982, CRITICAL PATH METHOD
[7]  
BOCTOR FF, 1990, EUR J OPER RES, V9, P3
[8]   Construction resource scheduling with genetic algorithms [J].
Chan, WT ;
Chua, DKH ;
Kannan, G .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02) :125-132
[9]  
Christofides N., 1987, COMP IND ENG, V12, P227
[10]  
Davis EW, 1973, AIIE Transactions, V5, P297