A study of simple rules for subcontracting in make-to-order manufacturing

被引:54
作者
Bertrand, JWM
Sridharan, V
机构
[1] Clemson Univ, Dept Management, Clemson, SC 29634 USA
[2] Eindhoven Univ Technol, Grad Sch Ind Engn & Management Sci, NL-5600 MB Eindhoven, Netherlands
关键词
operations and logistics management; subcontracting; probability models; heuristics; robustness analysis;
D O I
10.1016/S0377-2217(99)00371-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We study a low volume component manufacturing operation facing order arrival rate greater than the service rate, thus necessitating subcontracting of some of the orders, for the case where order lead times are exogenous and highly variable. The major objective of the firm is to maximize capacity utilization and minimize tardiness (so as to minimize cost and maximize delivery reliability). Limiting the focus to operational decisions, we develop four heuristic decision rules with varying informational needs and complexity to determine when and which orders should be subcontracted. The performance of the decision rules over a range of environments is examined first under the assumption of perfect information. Then, we investigate the robustness of the policies fbr up to +/-50% error in parameter estimates. The results show that, compared to simpler rules that do not seek to use the shop-workload information in making the subcontracting decision, the performance of the shop-workload feedback based decision rules (1) produce a superior performance, especially when the target utilization is high, and (2) are robust with up to +/-50% error in parameter estimates. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:509 / 531
页数:23
相关论文
共 21 条
[1]   PRIORITY ASSIGNMENT PROCEDURES IN MULTILEVEL ASSEMBLY JOB SHOPS [J].
ADAM, NR ;
BERTRAND, JWM ;
SURKIS, J .
IIE TRANSACTIONS, 1987, 19 (03) :317-328
[2]  
Baker K. R., 1981, J. Oper. Manage., V1, P109
[3]   A COMPARISON OF DUE-DATE SELECTION-RULES [J].
BAKER, KR ;
BERTRAND, JWM .
AIIE TRANSACTIONS, 1981, 13 (02) :123-131
[4]   SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP [J].
BAKER, KR .
MANAGEMENT SCIENCE, 1984, 30 (09) :1093-1104
[5]  
BAKER KR, 1982, J OPER MANAG, V3, P37, DOI DOI 10.1016/0272-6963(82)90020-1
[6]   Order review and release strategies in a job shop environment: A review and a classification [J].
Bergamaschi, D ;
Cigolini, R ;
Perona, M ;
Portioli, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (02) :399-420
[7]   THE EFFECT OF WORKLOAD DEPENDENT DUE-DATES ON JOB SHOP PERFORMANCE [J].
BERTRAND, JWM .
MANAGEMENT SCIENCE, 1983, 29 (07) :799-816
[8]  
Conway R.W., 1967, Theory of Scheduling
[9]   A DYNAMIC FORECASTING-MODEL FOR JOB-SHOP FLOWTIME PREDICTION AND TARDINESS CONTROL [J].
ENNS, ST .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (05) :1295-1312
[10]  
HAX AC, 1975, LOGISTICS, V1