Development of an early-warning time-of-failure analysis methodology for open-pit mine slopes utilizing ground-based slope stability radar monitoring data

被引:128
作者
Dick, Graham J. [1 ]
Eberhardt, Erik [1 ]
Cabrejo-Lievano, Albert G. [2 ]
Stead, Doug [3 ]
Rose, Nick D. [4 ]
机构
[1] Univ British Columbia, Geol Engn, Dept Earth Ocean & Atmospher Sci, Vancouver, BC V6T 1Z4, Canada
[2] GroundProbe Pty Ltd, Windsor, Qld 4030, Australia
[3] Simon Fraser Univ, Dept Earth Sci, Burnaby, BC V5A 1S6, Canada
[4] Piteau Associates Engn Ltd, N Vancouver, BC V7M 3G6, Canada
关键词
slope stability radar; inverse-velocity method; slope failure prediction; displacement monitoring; trigger action response plans;
D O I
10.1139/cgj-2014-0028
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The recent introduction of ground-based slope stability radar in open-pit mines to complement conventional geodetic monitoring programs provides near real-time deformation measurements over a broad coverage area; this allows geotechnical engineers to observe the spatial distribution of pit wall movements and their progression over time. This paper presents a newly proposed early warning time-of-failure (TOF) analysis procedure for use in real-time with ground-based radar measurements designed to be integrated in an open-pit mine's trigger action response plan (TARP). The inverse-velocity and slope gradient (SLO) TOF analysis methods are applied to radar displacement measurements using a new systematic multi-pixel selection technique termed the "percent deformation method." The utilization of the percent deformation method in the proposed real-time TOF analysis methodology gives more-reliable results than current practice by providing recommendations for pixel selections, data filtering, where and how to undertake TOF analyses, and presenting TOF results in real time. The addition of a more rigorous, methodical treatment of radar monitoring data when faced with critical slope instability will reduce uncertainty and increase confidence in any trigger action response decisions, helping to ensure a safer work environment.
引用
收藏
页码:515 / 529
页数:15
相关论文
共 25 条
  • [1] [Anonymous], [No title captured]
  • [2] [Anonymous], 2009, GUIDELINES OPEN PIT
  • [3] Armstrong J., 2009, SLOPE STABILITY 2009
  • [4] Cahill J., 2006, P INT S ROCK SLOP OP, P321
  • [5] Failure forecast for large rock slides by surface displacement measurements
    Crosta, GB
    Agliardi, F
    [J]. CANADIAN GEOTECHNICAL JOURNAL, 2003, 40 (01) : 176 - 191
  • [6] Day A., 2007, P 2007 INT S ROCK SL, P333, DOI [10.36487/ACG_repo/708_20, DOI 10.36487/ACG_REPO/708_20]
  • [7] Dick G.J, 2013, THESIS U BRIT COLUMB
  • [8] Dick G.J., 2013, P SLOP STAB 2013, P949
  • [9] Doyle J., 2011, P SLOP STAB 2011 INT
  • [10] Fukui K, 1997, P FALL M MIN MAT PRO, P91