Determination of optimum generation level in DTEP using a GA-based quadratic programming

被引:6
作者
Haddadian, H. [2 ]
Hosseini, S. H. [2 ]
Shayeghi, H. [1 ]
Shayanfar, H. A. [3 ]
机构
[1] Univ Mohaghegh Ardabili, Tech Engn Dept, Ardebil, Iran
[2] Zanjan Univ, Tech Engn Dept, Zanjan, Iran
[3] Iran Univ Sci & Technol, Dept Elect Engn, Ctr Excellence Power Syst Automat & Operat, Tehran, Iran
关键词
Dynamic transmission expansion planning; Generation level; GA; Quadratic programming;
D O I
10.1016/j.enconman.2010.07.013
中图分类号
O414.1 [热力学];
学科分类号
070201 [理论物理];
摘要
In this paper, a new approach by accomplishing dynamic transmission expansion planning (DTEP) problem, the optimum generation level of generators is determined for annual load peak using a genetic algorithm (GA) based quadratic programming (QP) method. This study is carried out in order to achieve a better prospect from the generation network and consequently the suitable planning for its future expansion. Another important aspect of this paper is taking the advantage of line outage distribution factors (LODFs) or sensitivity analysis for the evaluation of network reliability instead of the direct current load flow (DCLF), that the computations and performance of DTEP problem considerably speeds up in comparison with previous researches. Also, the applied coding for problem solution using GA is more flexible and is significantly improved the performance of the proposed method. The proposed method is successively applied to a realistic system of the 18-buses Azerbaijan regional electric network, which is located in the northwest of Iran, and the results are extensively analyzed. The results evaluation reveals that the generators with high capacity operated in full capacity almost the whole of the planning period, because the generation cost coefficients is decreased as the generator capacity increased and vice versa. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:382 / 390
页数:9
相关论文
共 19 条
[1]
[Anonymous], 2006, 2006 INT C PROB METH
[2]
Asada EN, 2005, IEEE POWER ENG SOC, P171
[3]
A greedy randomized adaptive search procedure for transmission expansion planning [J].
Binato, S ;
de Oliveira, GC ;
de Araújo, JL .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (02) :247-253
[4]
A multiyear dynamic approach for transmission expansion planning and long-term marginal costs computation [J].
Braga, ASD ;
Saraiva, JT .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (03) :1631-1639
[5]
Ceciliano JL, 1999, P EV COMP C, V3, P1803
[6]
Fonseka J, 2002, INT J COMPUT MATH EL, V23, P250
[7]
Technical and economic evaluation of voltage level in transmission network expansion planning using GA [J].
Jalilzadeh, S. ;
Kazemi, A. ;
Shayeghi, H. ;
MadaVi, M. .
ENERGY CONVERSION AND MANAGEMENT, 2008, 49 (05) :1119-1125
[8]
Integrating generation and transmission networks reliability for unit commitment solution [J].
Jalilzadeh, S. ;
Shayeghi, H. ;
Hadadian, H. .
ENERGY CONVERSION AND MANAGEMENT, 2009, 50 (03) :777-785
[9]
Transmission expansion planning from past to future [J].
Lee, C. W. ;
Ng, Simon K. K. ;
Zhong, J. ;
Wu, Felix F. .
2006 IEEE/PES POWER SYSTEMS CONFERENCE AND EXPOSITION. VOLS 1-5, 2006, :257-+
[10]
A NEW DECOMPOSITION BASED METHOD FOR OPTIMAL EXPANSION PLANNING OF LARGE TRANSMISSION NETWORKS [J].
LEVI, VA ;
CALOVIC, MS .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (03) :937-943