The value of coordination in a two-echelon supply chain

被引:46
作者
Disney, Stephen M. [1 ]
Lambrecht, Marc [2 ]
Towill, Denis R. [1 ]
Van de Velde, Wim [3 ]
机构
[1] Cardiff Univ, Logist Syst Dynam Grp, Cardiff Business Sch, Cardiff CF10 3EU, Wales
[2] Katholieke Univ Leuven, Dept Appl Econ, B-3000 Louvain, Belgium
[3] Procter & Gamble Serv Co NV, B-1853 Strombeek Bever, Belgium
关键词
supply chains; bullwhip; inventory variance; local optimization; global optimization;
D O I
10.1080/07408170701488003
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study a coordination scheme in a two-echelon supply chain. It involves sharing details of replenishment rules, lead times, demand patterns and tuning the replenishment rules to exploit the supply chain's cost structure. We examine four different coordination strategies: naive operation; local optimization; global optimization; and altruistic behavior on behalf of the retailer. We assume the retailer and the manufacturer use an order-up-to policy to determine replenishment orders and the consumer's demand is a stationary independent and identically distributed random variable. We derive the variance of the retailer's order rate and inventory levels and the variance of the manufacturer's order rate and inventory levels. We initially assume that costs in the supply chain are directly proportional to these variances ( and later the standard deviations) and investigate the options available to the supply chain members for minimizing costs. Our results show that if the retailer takes responsibility for supply chain cost reduction and acts altruistically by dampening his or her order variability, then the performance enhancement is robust to both the actual costs in the supply chain and to a naive or uncooperative manufacturer. Superior performance is achievable if. firms coordinate their actions and if they can find ways to reallocate the supply chain gain.
引用
收藏
页码:341 / 355
页数:15
相关论文
共 38 条
[1]  
[Anonymous], 1964, SAMPLING SYSTEMS THE
[2]  
[Anonymous], 2004, Manufacturing Service Oper. Management
[3]  
Balakrishnan A., 2004, Manufacturing & Service Operations Management, V6, P163, DOI 10.1287/msom.1030.0031
[4]   An integrated production and inventory model to dampen upstream demand variability in the supply chain [J].
Boute, Robert N. ;
Disney, Stephen M. ;
Lambrecht, Marc R. ;
Van Houdt, Benny .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 178 (01) :121-142
[5]  
Cachon GP, 2003, HDBK OPER R, V11, P229, DOI 10.1016/s0927-0507(03)11006-7
[6]   Supply chain coordination with revenue-sharing contracts: Strengths and limitations [J].
Cachon, GP ;
Lariviere, MA .
MANAGEMENT SCIENCE, 2005, 51 (01) :30-44
[7]  
Chatfield DC, 2004, PROD OPER MANAG, V13, P340, DOI 10.1111/j.1937-5956.2004.tb00222.x
[8]   Quantifying the bullwhip effect in a simple supply chain: The impact of forecasting, lead times, and information [J].
Chen, F ;
Drezner, Z ;
Ryan, JK ;
Simchi-Levi, D .
MANAGEMENT SCIENCE, 2000, 46 (03) :436-443
[9]   The myopic Order-Up-To policy with a proportional feedback controller [J].
Chen, Y. F. ;
Disney, S. M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (02) :351-368
[10]  
Dejonckheere J, 2003, PROD PLAN CONTROL, V14, P497, DOI [10.1080/09537280310001621967, 10.1080/09537280310001621958]