An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse

被引:30
作者
Topan, Engin [1 ,2 ]
Bayindir, Z. Pelin [1 ]
Tan, Tarkan [3 ]
机构
[1] Middle E Tech Univ, Dept Ind Engn, TR-06531 Ankara, Turkey
[2] Cankaya Univ, Dept Ind Engn, Ankara, Turkey
[3] Eindhoven Univ Technol, Sch Ind Engn, NL-5600 MB Eindhoven, Netherlands
关键词
Inventory; Branch and price; Two-echelon; Multi-item; Batch ordering; Spare parts; COLUMN GENERATION; SYSTEMS; MULTIECHELON; HEURISTICS; CONSTRAINT; LOGISTICS; ALGORITHM; POLICIES;
D O I
10.1016/j.orl.2010.05.006
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a multi-item two-echelon inventory system in which the central warehouse operates under a (Q, R) policy, and the local warehouses implement basestock policy. An exact solution procedure is proposed to find the inventory control policy parameters that minimize the system-wide inventory holding and fixed ordering cost subject to an aggregate mean response time constraint at each facility. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:454 / 461
页数:8
相关论文
共 22 条
[1]   An efficient heuristic optimization algorithm for a two-echelon (R, Q) inventory system [J].
Al-Rifai, Mohammad H. ;
Rossetti, Manuel D. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 109 (1-2) :195-213
[2]  
[Anonymous], 1998, Supermodularity and complementarity
[3]  
[Anonymous], 2003, Linear programming 2: theory and extensions
[4]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theory of NP-Completeness
[5]  
[Anonymous], 1996, Stochastic Processes
[6]  
Axsater S, 2006, INT SER OPER RES MAN, V90, P1, DOI 10.1007/0-387-33331-2
[7]  
AXSATER S, 1998, OPER RES, V46, P135
[8]   Branch-and-price: Column generation for solving huge integer programs [J].
Barnhart, C ;
Johnson, EL ;
Nemhauser, GL ;
Savelsbergh, MWP ;
Vance, PH .
OPERATIONS RESEARCH, 1998, 46 (03) :316-329
[9]   Exact evaluation of batch-ordering inventory policies in two-echelon supply chains with periodic review [J].
Cachon, GP .
OPERATIONS RESEARCH, 2001, 49 (01) :79-98
[10]   Two-echelon spare parts inventory system subject to a service constraint [J].
Caglar, D ;
Li, CL ;
Simchi-Levi, D .
IIE TRANSACTIONS, 2004, 36 (07) :655-666