A short-term scheduling for a hydropower plant chain

被引:22
作者
Pursimo, JM [1 ]
Antila, HK [1 ]
Vilkko, MK [1 ]
Lautala, PA [1 ]
机构
[1] Tampere Univ Technol, FIN-33101 Tampere, Finland
关键词
scheduling; utility application; optimal control;
D O I
10.1016/S0142-0615(98)00021-0
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
An optimal control of a hydropower plant chain is introduced. The aim is to meet a predefined power demand and in the same time provide sufficient control capabilities. At first a state-space model of the river chain is presented. Then an optimal feedback control method is developed by introducing Hamiltonian for the system. The constraints are considered using Lagrangian multipliers. As an example a river bed with eight hydra plants is studied. The results show the suitability of the method to production planning and to analysis of the hydro system behaviour. It can also be used for on-line scheduling. (C) 1998 Elsevier Science Ltd All rights reserved.
引用
收藏
页码:525 / 532
页数:8
相关论文
共 15 条
[1]  
Athans M., 1966, Optimal Control: An Introduction to the Theory and Its Applications
[2]  
Bittanti S., 2012, RICCATI EQUATION
[3]  
BRANNLUND H, 1986, THESIS ROYAL I TECHN
[4]  
BRANNLUND H, 1986, IEEE T POWER SYSTEMS, V1
[5]  
CHANCELIER JP, 1994, ELECT POWER ENERGY S, V16
[6]  
EA K, 1987, P 9 POW SYST COMP C
[7]  
HABIBOLLAHZADEH H, 1990, IEEE T POWER SYSTEMS, V5
[8]  
LAUTALA P, 1986, P 4 IASTED INT S MOD
[9]  
LAUTALA P, 1986, WATER POWER DAM CONS, V38
[10]  
LAUTALA P, 1976, 2 HELS U TECHN CONTR