A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations

被引:134
作者
Hung, YF [1 ]
Leachman, RC [1 ]
机构
[1] UNIV CALIF BERKELEY,ENGN SYST RES CTR,BERKELEY,CA 94720
关键词
D O I
10.1109/66.492820
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We introduce a methodology for automated production planning of semiconductor manufacturing based on iterative linear programming (LP) optimization and discrete-event simulation calculations, The LP formulation incorporates epoch-dependent parameters for flow times from lot release up to each operation on each manufacturing route, LP-derived release schedules are used as input to the simulation model, from which statistics on pow times are collected and used to reformulate the LP model for a revised planning Calculation, Iteration continues until satisfactory agreement between simulation and LP models is obtained, We demonstrate in experiments on an industry data set that a relatively small number of iterations is required to develop a production plan correctly characterizing future flow times as a function of factory load and product mix, The methodology makes possible automated production planning of semiconductor manufacturing on an engineering work station.
引用
收藏
页码:257 / 269
页数:13
相关论文
共 9 条
[1]   MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1983, 29 (10) :1126-1141
[2]  
GLASSEY CR, 1989, J OBJECT-ORIENT PROG, V2, P39
[3]   A GENERAL FRAMEWORK FOR MODELING PRODUCTION [J].
HACKMAN, ST ;
LEACHMAN, RC .
MANAGEMENT SCIENCE, 1989, 35 (04) :478-495
[4]  
HUNG YF, 1991, THESIS U CALIFORNIA
[5]  
KRAJEWSKI LJ, 1977, DECISION SCI, V8
[6]  
Leachman R. C, 1993, OPTIMIZATION IND, P1
[7]   ON CAPACITY MODELING FOR PRODUCTION PLANNING WITH ALTERNATIVE MACHINE TYPES [J].
LEACHMAN, RC ;
CARMON, TF .
IIE TRANSACTIONS, 1992, 24 (04) :62-72
[8]  
LEACHMAN RC, 1986, 8611 ORC U CAL ENG S
[9]  
*STEPST CORP, 1988, OBJ C REF MAN