A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem

被引:109
作者
Essafi, Imen [1 ]
Mati, Yazid [2 ]
Dauzere-Peres, Stephane [3 ]
机构
[1] CNRS, UMR 6597, IRCCyN Ecole Mines Nantes, F-44307 Nantes, France
[2] Al Qassim Univ, Coll Business & Adm, Almelaida, Al Qassim, Saudi Arabia
[3] Ecole Mines St Etienne, Ctr Microelect Provence, F-13541 Gardanne, France
关键词
job-shop scheduling; total weighted tardiness; hybrid genetic algorithm; local search;
D O I
10.1016/j.cor.2006.12.019
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers the job-shop problem with release dates and due dates, with the objective of minimizing the total weighted tardiness. A genetic algorithm is combined with an iterated local search that uses a longest path approach on a disjunctive graph model. A design of experiments approach is employed to calibrate the parameters and operators of the algorithm. Previous studies on genetic algorithms for the job-shop problem point out that these algorithms are highly depended on the way the chromosomes are decoded. In this paper, we show that the efficiency of genetic algorithms does no longer depend on the schedule builder when an iterated local search is used. Computational experiments carried out on instances of the literature show the efficiency of the proposed algorithm. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2599 / 2616
页数:18
相关论文
共 27 条
[1]   Tabu search for minimizing total tardiness in a job shop [J].
Armentano, VA ;
Scrich, CR .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 63 (02) :131-140
[2]   EVOLUTION BASED LEARNING IN A JOB-SHOP SCHEDULING ENVIRONMENT [J].
DORNDORF, U ;
PESCH, E .
COMPUTERS & OPERATIONS RESEARCH, 1995, 22 (01) :25-40
[3]  
FALKENAUER E, 1991, P 1991 IEEE INT C RO
[4]   ALGORITHMS FOR SOLVING PRODUCTION-SCHEDULING PROBLEMS [J].
GIFFLER, B ;
THOMPSON, GL .
OPERATIONS RESEARCH, 1960, 8 (04) :487-503
[5]   A hybrid genetic algorithm for the job shop scheduling problem [J].
Gonçalves, JF ;
Mendes, JJDM ;
Resende, MGC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (01) :77-95
[6]  
Graham R. L., 1979, Discrete Optimisation, P287
[7]   Deterministic job-shop scheduling: Past, present and future [J].
Jain, AS ;
Meeran, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 113 (02) :390-434
[8]  
Kreipl S., 2000, Journal of Scheduling, V3, P125, DOI 10.1002/(SICI)1099-1425(200005/06)3:3<125::AID-JOS40>3.0.CO
[9]  
2-C
[10]  
Lawrence S, 1984, SUPPLEMENT RESOURCE