A reactor-level analysis of busbar costs for US nuclear plants, 1970-2005

被引:99
作者
Koomey, Jonathan
Hultman, Nathan E.
机构
[1] Stanford Univ, Stanford, CA 94305 USA
[2] Univ Calif Berkeley, Lawrence Berkeley Lab, Energy Anal Dept, Berkeley, CA 94720 USA
[3] Georgetown Univ, Program Sci Technol & Int Affairs, Washington, DC 20057 USA
[4] Univ Oxford, James Martin Inst Sci & Civilizat, Oxford OX1 2JD, England
关键词
nuclear power; busbar costs; learning curves;
D O I
10.1016/j.enpol.2007.06.005
中图分类号
F [经济];
学科分类号
02 ;
摘要
We present a reactor-by-reactor analysis of historical busbar costs for 99 nuclear reactors in the United States, and compare those costs with recent projections for next-generation US reactors. We argue that cost projections far different from median historical costs require more justification than estimates that lie close to those medians. Our analysis suggests that some recent projections of capital costs, construction duration, and total operations and maintenance costs are quite low-far enough from the historical medians that additional scrutiny may be required to justify using such estimates in current policy discussions and planning. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:5630 / 5642
页数:13
相关论文
共 71 条
[1]   Estimating the cost of capital projects: an empirical study of accuracy levels for municipal government projects [J].
AbouRizk, SM ;
Babey, GM ;
Karumanasseri, G .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2002, 29 (05) :653-661
[2]  
[Anonymous], FUT NUCL POW INT MIT
[3]   Probabilistic forecasting of project performance using stochastic S curves [J].
Barraza, GA ;
Back, WE ;
Mata, F .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (01) :25-32
[4]  
BLAKE C, 1976, ANAL PROJECTED ACTUA
[5]  
Bokenkamp K., 2005, ELECT J, V18, P11, DOI DOI 10.1016/J.TEJ.2005.05.007
[6]  
Bowers H.I., 1987, Cost Estimating Relationships for Nuclear Power Plant Operation and Maintenance
[7]  
BRADISH D, 2005, EMAIL SPREADSHEETS C
[8]   The economics of reprocessing versus direct disposal of spent nuclear fuel [J].
Bunn, M ;
Holdren, JP ;
Fetter, S ;
van der Zwaan, B .
NUCLEAR TECHNOLOGY, 2005, 150 (03) :209-230
[9]  
Bupp I.C., 1981, FAILED PROMISE NUCL
[10]  
BUPP IC, 1975, EC NUCL POWER TECHNO, P14