MRP performance effects due to lot size and planned lead time settings

被引:60
作者
Enns, ST [1 ]
机构
[1] Univ Calgary, Dept Mech & Mfg Engn, Calgary, AB T2N 1N4, Canada
关键词
D O I
10.1080/00207540010002810
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The effects of lot size and planned lead time settings are evaluated in a shop producing assembled products with common components. Material requirements planning (MRP) logic is used for production planning. A framework for the analysis of delays within the production system is presented. These delays are evaluated using spreadsheet- based MRP software linked to a simulation package that emulates shopfloor activity. Results show that by selecting the proper lot sizes and then using the planned leadtimes to control delivery performance, the required inventory levels can be minimized.
引用
收藏
页码:461 / 480
页数:20
相关论文
共 20 条
[1]   PRIORITY ASSIGNMENT PROCEDURES IN MULTILEVEL ASSEMBLY JOB SHOPS [J].
ADAM, NR ;
BERTRAND, JWM ;
SURKIS, J .
IIE TRANSACTIONS, 1987, 19 (03) :317-328
[2]  
ADAMS NR, 1993, EUROPEAN J OPERATION, V68, P79
[3]  
[Anonymous], PRODUCTION INVENTORY
[4]  
Baker K.R., 1993, Logistics of Production and Inventory: Handbook in Operations Research and Management Science, P571
[5]  
BENTON WC, 1991, J OPER RES SOC, V42, P1087, DOI 10.2307/2582955
[6]  
Biggs J. R., 1982, Decision Sciences, V13, P570, DOI 10.1111/j.1540-5915.1982.tb01183.x
[7]  
ENNS ST, 1999, MRP PERFORMANCE EFFE
[8]  
ENNS ST, 1998, CANADIAN SOC MECH EN, V3, P150
[9]  
FILDES R, 1997, 0197 MS LANC U
[10]  
Hoyt J., 1978, PRODUCTION INVENTORY, V19, P63