Probabilistic performance assessment of a coal-fired power plant

被引:30
作者
Hanak, D. P. [1 ]
Kolios, A. J. [1 ]
Biliyok, C. [1 ]
Manovic, V. [1 ]
机构
[1] Cranfield Univ, Energy & Power Engn Div, Sch Engn, Cranfield MK43 0AL, Beds, England
基金
英国工程与自然科学研究理事会;
关键词
Probabilistic performance assessment; Coal-fired power plant; Stochastic modelling; Stochastic response surface method; Monte Carlo simulation; ASYMPTOTIC APPROXIMATIONS; STRUCTURAL RELIABILITY; SYSTEM; CHAIN; MODEL;
D O I
10.1016/j.apenergy.2014.10.079
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Despite the low-carbon environmental policies, coal is expected to remain a main source of energy in the coming decades. Therefore, efficient and environmentally friendly power systems are required. A design process based on the deterministic models and application of the safety factors leads to the equipment oversizing, hence fall in the efficiency and increase in the capital and operating costs. In this work, applicability of a non-intrusive stochastic methodology to determine the probability of the power plant equipment failure was investigated. This alternative approach to the power plant performance assessment employs approximation methods for the deterministic prediction of the key performance indicators, which are used to estimate reliability indices based on the uncertainty of the input to a process model of the coal-fired power plant. This study revealed that high reliability indices obtained in the analysis would lead to reduced application of conservative safety factors on the plant equipment, which should result in lower capital and operating cost, through a more reliable assessment of its performance state over its service time, and lead to the optimisation of its inspection and maintenance interventions. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:350 / 364
页数:15
相关论文
共 54 条
[1]  
ABB, 2009, EN EFF DES AUX SYST
[2]  
Adhikary D.D., 2012, INT J IND ENG COMP, V3, P423
[3]  
AFFOLTER RH, 2002, RESOURCE ASSESSMENT, pE1
[4]  
Affolter RH, GEOLOGIC ASSESSMENT, pG1
[5]  
[Anonymous], 2014, Energy technology perspectives: Harnessing electricity's potential
[6]  
[Anonymous], 2012, CO2 emissions from fuel combustion highlights
[7]   Stochastic analysis and maintenance planning of the ash handling system in the thermal power plant [J].
Arora, N ;
Kumar, D .
MICROELECTRONICS AND RELIABILITY, 1997, 37 (05) :819-824
[8]   High efficiency electric power generation:: The environmental role [J].
Beer, Janos M. .
PROGRESS IN ENERGY AND COMBUSTION SCIENCE, 2007, 33 (02) :107-134
[9]   Evaluation of natural gas combined cycle power plant for post-combustion CO2 capture integration [J].
Biliyok, Chechet ;
Yeung, Hoi .
INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2013, 19 :396-405
[10]   ASYMPTOTIC APPROXIMATIONS FOR MULTIVARIATE INTEGRALS WITH AN APPLICATION TO MULTINORMAL PROBABILITIES [J].
BREITUNG, K ;
HOHENBICHLER, M .
JOURNAL OF MULTIVARIATE ANALYSIS, 1989, 30 (01) :80-97