共 13 条
- [1] AKKAN C, 1993, THESIS CORNELL U US
- [2] SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP [J]. MANAGEMENT SCIENCE, 1984, 30 (09) : 1093 - 1104
- [4] CONWAY RW, 1991, ANN M PROD OP MAN SO
- [5] CONWAY RW, 1993, PRS PRODUCTION RESER
- [6] Conway RW., 1967, THEORY SCHEDULING
- [7] Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
- [10] JOB SHOP SCHEDULING WITH DUE DATES AND OVERTIME CAPABILITY [J]. MANAGEMENT SCIENCE SERIES A-THEORY, 1974, 21 (01): : 68 - 78