A Two-Stage Planning Model for Power Scheduling in a Hydro-Thermal System Under Uncertainty

被引:60
作者
Nuernberg, Robert [1 ]
Roemisch, Werner [1 ]
机构
[1] Humboldt Univ, Inst Math, D-10099 Berlin, Germany
关键词
stochastic programming; Lagrangian relaxation; unit commitment;
D O I
10.1023/A:1021531823935
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A two-stage stochastic programming model for the short-or mid-term cost-optimal electric power production planning is developed. We consider the power generation in a hydro-thermal generation system under uncertainty in demand (or load) and prices for fuel and delivery contracts. The model involves a large number of mixed-integer (stochastic) decision variables and constraints linking time periods and operating power units. A stochastic Lagrangian relaxation scheme is designed by assigning (stochastic) multipliers to all constraints that couple power units. It is assumed that the stochastic load and price processes are given (or approximated) by a finite number of realizations (scenarios). Solving the dual by a bundle subgradient method leads to a successive decomposition into stochastic single unit subproblems. The stochastic thermal and hydro subproblems are solved by a stochastic dynamic programming technique and by a specific descent algorithm, respectively. A Lagrangian heuristics that provides approximate solutions for the primal problem is developed. Numerical results are presented for realistic data from a German power utility and for numbers of scenarios ranging from 5 to 100 and a time horizon of 168 hours. The sizes of the corresponding optimization problems go up to 400.000 binary and 650.000 continuous variables, and more than 1.300.000 constraints.
引用
收藏
页码:355 / 378
页数:24
相关论文
共 24 条
[1]  
AHMED S, 2002, J GLOBAL OP IN PRESS
[2]   OPTIMAL SHORT-TERM SCHEDULING OF LARGE-SCALE POWER-SYSTEMS [J].
BERTSEKAS, DP ;
LAUER, GS ;
SANDELL, NR ;
POSBERGH, TA .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1983, 28 (01) :1-11
[3]  
Birge J. R., 1997, INFORMS Journal on Computing, V9, P111, DOI 10.1287/ijoc.9.2.111
[4]   Dual decomposition in stochastic integer programming [J].
Caroe, CC ;
Schultz, R .
OPERATIONS RESEARCH LETTERS, 1999, 24 (1-2) :37-45
[5]  
CAROE CC, 1998, 9813 DFG SCHWERP ECH
[6]   Stochastic optimization of unit commitment: A new decomposition framework [J].
Carpentier, P ;
Cohen, G ;
Culioli, JC ;
Renaud, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) :1067-1073
[7]  
Dentcheva D, 1998, LECT NOTES ECON MATH, V458, P22
[8]   Dual applications of proximal bundle methods, including Lagrangian relaxation of nonconvex problems [J].
Feltenmark, S ;
Kiwiel, KC .
SIAM JOURNAL ON OPTIMIZATION, 2000, 10 (03) :697-721
[9]  
GOLLMER R, 1999, P 13 POW SYST COMP C, V2, P724
[10]   A SIMPLE RECOURSE MODEL FOR POWER DISPATCH UNDER UNCERTAIN DEMAND [J].
GROWE, N ;
ROMISCH, W ;
SCHULTZ, R .
ANNALS OF OPERATIONS RESEARCH, 1995, 59 :135-164