Probabilistic Wind Energy Modeling in Electric Generation System Reliability Assessment

被引:55
作者
Zhang, Yi [1 ]
Chowdhury, A. A. [1 ]
Koval, D. O. [2 ]
机构
[1] Calif Independent Syst Operator, Folsom, CA 95630 USA
[2] Univ Alberta, Edmonton, AB T6G 2E1, Canada
关键词
Cost; outage rate; planning; reliability; transmission availability; wind energy;
D O I
10.1109/TIA.2011.2127435
中图分类号
T [工业技术];
学科分类号
120111 [工业工程];
摘要
Power grid reliability impacts could be significant when a large amount of variable wind generation is integrated with the electric power system. The widely used deterministic reliability assessment method is invalid when modeling the intermittency of wind energy sources. The energy-based probabilistic reliability assessment models are required in system reliability impact assessment in order to consider the stochastic characteristic of wind resources. This paper investigates different stochastic characteristics in wind energy integration, including resource availability, generation facility outage, and transmission availability. A probabilistic framework of reliability modeling for renewable resource integration such as wind energy conversion system is proposed in this paper. Using the proposed reliability models and framework, the cost of wind energy integration with the power grid for maintaining system adequacy and reliability can be evaluated realistically. The IEEE Reliability Test System is utilized to demonstrate the developed models and methods. The methodology can be used for modeling the reliability of industrial and commercial facilities being serviced by wind farms and transmission lines.
引用
收藏
页码:1507 / 1514
页数:8
相关论文
共 13 条
[1]
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[2]
[Anonymous], 2007, CEC1002007008CMF, P101
[3]
[Anonymous], Probability, Random Variables and Stochastic Processes
[4]
[Anonymous], 2009, P IEEE POW EN SOC GE
[5]
Time-series models for reliability evaluation of power systems including wind energy [J].
Billinton, R ;
Chen, H ;
Ghajar, R .
MICROELECTRONICS AND RELIABILITY, 1996, 36 (09) :1253-1261
[6]
RELIABILITY EVALUATION IN ENERGY LIMITED GENERATING CAPACITY STUDIES [J].
BILLINTON, R ;
HARRINGTON, PG .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1978, 97 (06) :2076-2085
[7]
Billinton R., 1994, RELIABILITY EVALUATI, DOI DOI 10.1007/978-1-4615-7731-7
[8]
CAISO, 2009, RETI PHAS 2 CONC TRA
[9]
Reliability models for large wind farms in generation system planning [J].
Chowdhury, AA .
2005 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS, 1-3, 2005, :1926-1933
[10]
DEVELOPMENT OF A NEW PROCEDURE FOR RELIABILITY MODELING OF WIND TURBINE GENERATORS [J].
GIORSETTO, P ;
UTSUROGI, KF .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1983, 102 (01) :134-143