Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources

被引:40
作者
Katok, E [1 ]
Lewis, HS
Harrison, TP
机构
[1] Colorado Sch Mines, Div Econ & Business, Golden, CO 80401 USA
[2] Penn State Univ, Dept Management Sci & Informat Syst, University Pk, PA 16802 USA
关键词
lot sizing; general assembly system; heuristics; integer programming;
D O I
10.1287/mnsc.44.6.859
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We introduce a heuristic method for finding good, feasible solutions for multiproduct lot sizing problems with general assembly structures, multiple constrained resources, and nonzero setup costs and setup times. We evaluate the performance of this heuristic by comparing its solutions to optimal solutions of small randomly generated problems and to time-truncated Optimization Subroutine Library (OSL) solutions of medium-sized randomly generated problems. In the first case, the heuristic locates solutions averaging 4 percent worse than optimal in less than 1 percent of time required by OSL. The heuristic solutions to medium-sized problems are approximately 26 percent better than solutions OSL finds after 10,000 CPU seconds, and the heuristic finds these solutions in approximately 10 percent of OSL time.
引用
收藏
页码:859 / 877
页数:19
相关论文
共 28 条
[1]   DETERMINING LOT SIZES AND RESOURCE REQUIREMENTS - A REVIEW [J].
BAHL, HC ;
RITZMAN, LP ;
GUPTA, JND .
OPERATIONS RESEARCH, 1987, 35 (03) :329-345
[2]  
BICKEL JP, 1977, MATH STAT BASIC IDEA
[3]   MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1983, 29 (10) :1126-1141
[4]   HEURISTICS FOR MULTILEVEL LOT-SIZING WITH A BOTTLENECK [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1986, 32 (08) :989-1006
[5]   COMPUTATIONAL-COMPLEXITY OF THE CAPACITATED LOT SIZE PROBLEM [J].
BITRAN, GR ;
YANASSE, HH .
MANAGEMENT SCIENCE, 1982, 28 (10) :1174-1186
[6]   IMPROVED HEURISTICS FOR MULTISTAGE REQUIREMENTS PLANNING SYSTEMS [J].
BLACKBURN, JD ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1982, 28 (01) :44-56
[7]   CAPACITATED LOT-SIZING AND SCHEDULING BY LAGRANGEAN RELAXATION [J].
DIABY, M ;
BAHL, HC ;
KARWAN, MH ;
ZIONTS, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 59 (03) :444-458
[8]   A LAGRANGEAN RELAXATION APPROACH FOR VERY-LARGE-SCALE CAPACITATED LOT-SIZING [J].
DIABY, M ;
BAHL, HC ;
KARWAN, MH ;
ZIONTS, S .
MANAGEMENT SCIENCE, 1992, 38 (09) :1329-1340
[9]  
Dixon Paul S., 1981, Journal of Operations Management, V2, P23, DOI [https://doi.org/10.1016/0272-6963(81)90033-4, DOI 10.1016/0272-6963(81)90033-4]
[10]   SOLVING MULTI-ITEM CAPACITATED LOT-SIZING PROBLEMS USING VARIABLE REDEFINITION [J].
EPPEN, GD ;
MARTIN, RK .
OPERATIONS RESEARCH, 1987, 35 (06) :832-848