On lot streaming in multistage production systems

被引:13
作者
Hoque, MA
Goyal, SK
机构
[1] Concordia Univ, John Molson Sch Business, Dept Decis Sci & MIS, Montreal, PQ H3G 1M8, Canada
[2] Univ Sains Malaysia, Sch Math Sci, Minden Panang 11800, Malaysia
关键词
single product; serial production system; overlapping production; set up; transportation time;
D O I
10.1016/j.ijpe.2003.12.003
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Recently a model on processing a product in a multistage serial production system by overlapping production between stages is presented in the literature. For minimum in-process inventory the production flow is synchronized by shifting the lot, from a stage to the next in equal shipment sizes. An optimal solution procedure for obtaining the minimum cost of set up, transportation and inventory is also developed taking into account the non-negative set up and transportation times. In their paper, the authors ignored the recently published literature on the topic, where a model is developed to minimize the total cost by synchronizing the production flow in the system by shifting the lot from a stage to the next in equal and unequal shipment sizes, but without considering set up and transportation times. In this note, this model is extended to include the set up and transportation times. Two numerical examples are solved to illustrate the extended model. (C) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:195 / 202
页数:8
相关论文
共 4 条
[1]   Determining manufacturing batch sizes for a lumpy delivery system with trend demand [J].
Diponegoro, A ;
Sarker, BR .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 77 (02) :131-143
[2]   A CONSTANT LOT SIZE MODEL WITH EQUAL AND UNEQUAL SIZED BATCH SHIPMENTS BETWEEN PRODUCTION STAGES [J].
GOYAL, SK ;
SZENDROVITS, AZ .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1986, 10 (03) :203-210
[3]   An optimal solution algorithm for the constant lot-size model with equal and unequal sized batch shipments for the single product multi-stage production system [J].
Hoque, MA ;
Kingsman, BG .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1995, 42 (02) :161-174
[4]   Lot streaming in multistage production systems [J].
Ramasesh, RV ;
Fu, HZ ;
Fong, DKH ;
Hayya, JC .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 66 (03) :199-211