Supply planning under uncertainties in MRP environments: A state of the art

被引:120
作者
Dolgui, Alexandre [2 ]
Prodhon, Caroline [1 ]
机构
[1] Univ Technol Troyes, FRE CNRS 2848, Inst Charles Delaunay, F-10010 Troyes, France
[2] Ecole Natl Super Mines, Div Ind Engn & Comp Sci, Sci Methods Ind Management Dept, F-42023 St Etienne, France
关键词
production systems; inventory control; planning; uncertainty;
D O I
10.1016/j.arcontrol.2007.02.007
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Inventory control in a supply chain is crucial for companies desiring to satisfy their customers demands as well as controlling costs. This paper examines specifically supply planning under uncertainties in MRP environments. Models from literature that deal with random demand or lead time uncertainties are described and commented. Promising research areas emerge from this survey. It appears that lead time uncertainty has been ignored in the past, in spite of their significant importance. In particular, an interesting topic concerns assembly systems with uncertain lead times, for which the main difficulty comes from the inter-dependence of components inventories. Another promising issue, which is also presented, relates to supply planning under simultaneously demand and lead time uncertainties, which is certainly of great interest for both the academic and industrial communities. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:269 / 279
页数:11
相关论文
共 86 条
[1]  
[Anonymous], 1981, INT J OPERATIONS PRO
[2]  
[Anonymous], INT J PRODUCTION RES
[3]  
ARDA Y, 2004, 11 IFAC S
[4]   Inventory control in a multi-supplier system [J].
Arda, Yasemin ;
Hennet, Jean-Claude .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 104 (02) :249-259
[5]  
BACKER K, 1993, HDB OPERATIONS RES M, V4, P571
[6]   Schedule instability, service level and cost in a material requirements planning system [J].
Bai, X ;
Davis, JS ;
Kanet, JJ ;
Cantrell, S ;
Patteson, JW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (07) :1725-1758
[7]  
Ballou R.H., 1999, BUSINESS LOGISTICS M, V4th
[8]   Lead-time reduction in a stochastic inventory system with learning consideration [J].
Ben-Daya, M ;
Hariga, M .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (03) :571-579
[9]  
Biggs J. R., 1982, Decision Sciences, V13, P570, DOI 10.1111/j.1540-5915.1982.tb01183.x
[10]   A COMPARISON OF STRATEGIES TO DAMPEN NERVOUSNESS IN MRP SYSTEMS [J].
BLACKBURN, JD ;
KROPP, DH ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1986, 32 (04) :413-429