A novel hybrid MCDM approach for offshore wind farm site selection: A case study of Iran

被引:173
作者
Fetanat, Abdolvahhab [1 ]
Khorasaninejad, Ehsan [2 ]
机构
[1] Islamic Azad Univ, Behbahan Branch, Dept Elect Engn, Behbahan, Iran
[2] Islamic Azad Univ, Behbahan Branch, Dept Mech Engn, Behbahan, Iran
关键词
Fuzzy ANP; Fuzzy DEMATEL; Fuzzy ELECTRE; Multi criteria decision making; Offshore wind farm; DECISION-MAKING; COASTAL MANAGEMENT; KOREAN PENINSULA; FUZZY DEMATEL; ENERGY; POWER; DESIGN; TRANSMISSION; FEASIBILITY; SYSTEMS;
D O I
10.1016/j.ocecoaman.2015.02.005
中图分类号
P7 [海洋学];
学科分类号
0707 ;
摘要
The multi criteria decision making (MCDM) has been applied in Integrated Energy Planning (IEP) and Integrated Coastal Management (ICM) frameworks. In this paper, a novel hybrid MCDM approach based on the fuzzy analytic network process (ANP), fuzzy decision making trail and evaluation laboratory (DEMATEL) and fuzzy elimination and choice expressing the reality (ELECTRE) methodologies is applied to assist in the site selection of offshore wind farm (OWF) as the renewable energy in the IEP and the ICM frameworks. The aim of this study is to find the best site selection of offshore wind farm for four sites (alternatives) in Bandar Deylam on the Persian Gulf in southwest of Iran. Six criteria (depths and heights, environmental issues, proximity to facilities, economic aspects, resource technical levels and culture) and the related sub-criteria are considered to select proper sites for power station of OWF. The fuzzy ANP method is employed for standpoints of the site selection (goal) subject to the criteria and is performed the criteria subject to the sub-criteria. In addition, due to considering the influences of the criterion to another criterion, the fuzzy DEMATEL is employed in criteria and sub-criteria sections. Moreover, the fuzzy ELECTRE is applied to calculate the decision making matrices of sub-criteria to alternatives. The results show that the alternative A(3) is the best site of OWF for Bandar Deylam. Then A(2), A(4) are the best alternatives and finally alternative A(1) is the worst site. Also, a sensitivity analysis is performed to investigate the robustness of the outcomes of decision making by changing the priorities of the criteria. The results indicate the robustness of this method when the experts' opinions subject to the criteria change. The evaluation criteria and this methodology could be applied to other coastal cities for promoting the progress of ICM towards the goal of sustainability. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:17 / 28
页数:12
相关论文
共 57 条
[1]  
Arianejad M., 2009, MULTICRITERIA DECISI
[2]  
Asgharpour MJ., 2011, MULTIPLE CRITERIA DE
[3]  
Awan A.G., 2013, International Journal of Asian Social Science, V3, P741
[4]  
Benayoun R., 1966, TECHNICAL REPORT
[5]   A novel hybrid MCDM approach based on fuzzy DEMATEL, fuzzy ANP and fuzzy TOPSIS to evaluate green suppliers [J].
Buyukozkan, Gulcin ;
Cifci, Gizem .
EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (03) :3000-3011
[6]   Development of offshore wind power in China [J].
Chen, Jinjin .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2011, 15 (09) :5013-5020
[7]   Transmission of wave energy through an offshore wind turbine farm [J].
Christensen, Erik Damgaard ;
Johnson, Martin ;
Sorensen, Ole Rene ;
Hasager, Charlotte Bay ;
Badger, Merete ;
Larsen, Soren Ejling .
COASTAL ENGINEERING, 2013, 82 :25-46
[8]   Wake effects of large offshore wind farms identified from satellite SAR [J].
Christiansen, MB ;
Hasager, CB .
REMOTE SENSING OF ENVIRONMENT, 2005, 98 (2-3) :251-268
[9]   Power generation efficiency analysis of offshore wind farms connected to a SLPC (single large power converter) operated with variable frequencies considering wake effects [J].
de Prada Gil, Mikel ;
Gomis-Bellmunt, Oriol ;
Sumper, Andreas ;
Bergas-Jane, Joan .
ENERGY, 2012, 37 (01) :455-468
[10]   Public opinion about large offshore wind power: Underlying factors [J].
Firestone, Jeremy ;
Kempton, Willett .
ENERGY POLICY, 2007, 35 (03) :1584-1598