Numerical model linking bed and bank evolution of incisional channel created by dam removal

被引:49
作者
Cantelli, A. [1 ]
Wong, M.
Parker, G.
Paola, C.
机构
[1] Univ Illinois, Natl Ctr Earth Surface Dynam, Dept Civil & Environm Engn, Urbana, IL 61801 USA
[2] Shell Int Explorat & Prod Inc, Houston, TX USA
[3] Barr Engn Co, Minneapolis, MN USA
[4] Univ Minnesota, Natl Ctr Earth Surface Dynam, St Anthony Falls Hydraul Lab, Minneapolis, MN USA
关键词
D O I
10.1029/2006WR005621
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper is devoted to a morphodynamic model of incision into a reservoir deposit driven by partial or total removal of the associated dam. The model considers the erosional processes upstream of the position of the former dam, rather then the deposition that occurs downstream. A theory is developed to predict the evolution of both the width and depth of the incisional channel that develops as erosion progresses. The theory is implemented in a numerical model, which is tested against and verified with flume experiments on sudden, complete removal of a dam. In these experiments a channel of a given initial width is allowed to freely incise into a noncohesive reservoir deposit after sudden dam removal. These experiments show a phenomenon that we refer to as '' erosional narrowing.'' That is, as a channel of a given initial width rapidly incises into the deposit, it can become narrower. As the rate of incision slows, this short period of rapid narrowing is followed by a longer period of widening. In the model the incisional channel is abstracted to a trapezoidal channel with well- defined bed and bank regions, both of which are allowed to erode. Balance between bed and bank erosion plays a key role in the morphodynamics of the channel. More specifically, rapid erosion of the bed can cause the channel to narrow even as bank erosion progresses. As the rate of bed erosion slows, bank erosion causes channel widening. This observed pattern is explained in the context of a theoretical model tested against the experiments.
引用
收藏
页数:16
相关论文
共 23 条
[1]  
[Anonymous], 1984, INCISED CHANNELS MOR
[2]  
[Anonymous], 1950, TECH B
[3]   Experiments on upstream-migrating erosional narrowing and widening of an incisional channel caused by dam removal [J].
Cantelli, A ;
Paola, C ;
Parker, G .
WATER RESOURCES RESEARCH, 2004, 40 (03) :W033041-W0330412
[4]   Dam Removal Express Assessment Models (DREAM). Part 1: Model development and validation [J].
Cui, Yantao ;
Parker, Gary ;
Braudrick, Christian ;
Dietrich, William E. ;
Cluer, Brian .
JOURNAL OF HYDRAULIC RESEARCH, 2006, 44 (03) :291-307
[5]   Dam Removal Express Assessment Models (DREAM). Part 2: Sample runs/sensitivity tests [J].
Cui, Yantao ;
Braudrick, Christian ;
Dietrich, William E. ;
Cluer, Brian ;
Parker, Gary .
JOURNAL OF HYDRAULIC RESEARCH, 2006, 44 (03) :308-323
[6]   Channel adjustments following two dam removals in Wisconsin [J].
Doyle, MW ;
Stanley, EH ;
Harbor, JM .
WATER RESOURCES RESEARCH, 2003, 39 (01) :ESG21-ESG215
[7]  
GRAF WL, 2002, DAM REMOVAL RES STAT
[8]   BEND THEORY OF RIVER MEANDERS .1. LINEAR DEVELOPMENT [J].
IKEDA, S ;
PARKER, G ;
SAWAI, K .
JOURNAL OF FLUID MECHANICS, 1981, 112 (NOV) :363-377
[9]  
Johannesson H., 1989, WATER RESOUR MONOGR, V12, P181, DOI DOI 10.1029/WM012P0181
[10]   A NEW VECTORIAL BEDLOAD FORMULATION AND ITS APPLICATION TO THE TIME EVOLUTION OF STRAIGHT RIVER CHANNELS [J].
KOVACS, A ;
PARKER, G .
JOURNAL OF FLUID MECHANICS, 1994, 267 :153-183