The purpose of this paper is to examine the impact of forecasting errors on the scheduling instability in a material requirements planning (MRP) operating environment. A sophisticated forecasting method is supposed to provide an accurate forecasting result, which, in turn, should create stable down-stream operating conditions. Through a simulation experiment, we find that forecasting errors may not cause a higher degree of scheduling instability given the forecast errors considered in this study. The scheduling instability, or MRP system nervousness, can be mitigated by using an appropriate lot-sizing rule. Thus, it is important for schedulers to understand this correlation between forecast errors and scheduling stability. After schedulers take reasonable efforts to find a good forecasting method, they don't need to be overly concerned with the associated forecast errors. The selection of an appropriate lot-sizing rule is capable of coping with forecast errors.
引用
收藏
页码:2285 / 2299
页数:15
相关论文
共 34 条
[1]  
Adam Everett E., 1973, DECISION SCI, V4, P458
[2]   A DIAGNOSTIC STUDY CONCERNING LARGE FLUCTUATIONS IN LOAD PLANS AND STOCKS AT SALES-PRODUCTION INTERFACE IN A LARGE SWITCHGEAR COMPANY [J].
AWATE, PG .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 15 :157-161
[3]   ANALYSIS OF PROPAGATION OF STOCHASTIC ERRORS THROUGH AN MRP SYSTEM, AND AN INDUSTRIAL CASE-STUDY [J].
AWATE, PG .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 15 :147-150
[4]  
Berry W. L., 1972, PRODUCTION INVENTORY, V13, P19
[5]  
Berry W.L., 1972, NATCO D COMPUTER AUG
[6]   A COMPARISON OF STRATEGIES TO DAMPEN NERVOUSNESS IN MRP SYSTEMS [J].
BLACKBURN, JD ;
KROPP, DH ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1986, 32 (04) :413-429
[7]   IMPROVED HEURISTICS FOR MULTISTAGE REQUIREMENTS PLANNING SYSTEMS [J].
BLACKBURN, JD ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1982, 28 (01) :44-56
[8]  
CAMPBELL KL, 1971, PRODUCTION INVENTORY, V12, P53
[9]  
Carlson R.C., 1979, MANAGE SCI, V25, P745
[10]   BUFFERING DECISIONS UNDER MRP ENVIRONMENT - A REVIEW [J].
CHU, CH ;
HAYYA, JC .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1988, 16 (04) :325-331