I-Risk: development of an integrated technical and management risk methodology for chemical installations

被引:82
作者
Papazoglou, IA
Bellamy, LJ
Hale, AR
Aneziris, ON
Ale, BJM
Post, JG
Oh, JIH
机构
[1] Natl Ctr Sci Res DEMOKRITOS, Aghia Paraskevi 15310, Greece
[2] Minist Social Affairs & Employment, NL-2509 LV The Hague, Netherlands
[3] Natl Inst Publ Hlth & Environm, RIVM, NL-3720 BA Bilthoven, Netherlands
[4] Tech Univ Delft, NL-2628 EB Zuid Holland, Netherlands
[5] White Queen, NL-2130 AS Hoofddorp, Netherlands
关键词
integrated risk assessment; QRA; safety management system; safety audit; ammonia storage tank;
D O I
10.1016/j.jlp.2003.08.008
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This paper presents an integrated quantitative risk assessment method for hazardous installations, taking into account management as well as technical design and producing risk level measures. The key components of the I-Risk methodology are the technical model, the management model and their interface. The technical model consists of developing a master logic diagram (MLD) delineating the major immediate causes of loss of containment (LOC) and associated quantitative models for assessing their frequency. The management model consists of the tasks, which must be carried out systematically in the primary business functions (such as operations, emergency operations, maintenance and modifications). A management audit quantifies the quality of these management tasks. The management-technical interface modifies certain parameters of the technical model on the basis of the quality of the safety management system of the specific installation. The methodology is exemplified through its application to the risk assessment of an ammonia storage facility. A detailed technical model simulating the response of the system to various initiating events is developed along with a detailed management model simulating the influence of the plant-specific management and organisational practices. The overall effect is quantified through the frequency of release of ammonia as a result of a loss of containment in a storage tank and in a pipeline. (C) 2003 Elsevier Ltd. All rights reserved.
引用
收藏
页码:575 / 591
页数:17
相关论文
共 23 条
[1]  
APOSOLAKIS G, 1981, METHODOLOGY PROBABIL
[2]   Human and organization factors: engineering operating safety into offshore structures [J].
Bea, RG .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1998, 61 (1-2) :109-126
[3]  
Bellamy L.J., 1993, INT PROC SAF MAN WOR
[4]  
Bellamy LJ, 1999, ENVACT960243
[5]  
BELLAMY LJ, 1993, 3 ASI C MIL NOV
[6]  
*CCPS, 1989, GUID CHEM PROC QUANT
[7]   THE WORK PROCESS ANALYSIS MODEL (WPAM) [J].
DAVOUDIAN, K ;
WU, JS ;
APOSTOLAKIS, G .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1994, 45 (1-2) :107-125
[8]   Modelling of safety management systems [J].
Hale, AR ;
Heming, BHJ ;
Carthey, J ;
Kirwan, B .
SAFETY SCIENCE, 1997, 26 (1-2) :121-140
[9]   Safety Management Assessment System (SMAS): a process for identifying and evaluating human and organization factors in marine system operations with field test results [J].
Hee, DD ;
Pickrell, BD ;
Bea, RG ;
Roberts, KH ;
Williamson, RB .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1999, 65 (02) :125-140
[10]   Measures of safety management performance and attitudes to safety at major hazard sites [J].
Hurst, NW ;
Young, S ;
Donald, I ;
Gibson, H ;
Muyselaar, A .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 1996, 9 (02) :161-172