R & D of CdTe-absorber photovoltaic cells, modules, and manufacturing equipment: Plan and progress to 100 MW/yr

被引:25
作者
Rose, D [1 ]
Powell, R [1 ]
Jayamaha, U [1 ]
Maltby, M [1 ]
Giolando, D [1 ]
McMaster, A [1 ]
Kormanyos, K [1 ]
Faykosh, G [1 ]
Klopping, J [1 ]
Dorer, G [1 ]
机构
[1] First Solar, LLC, Ctr Technol, Perrysburg, OH 43551 USA
来源
CONFERENCE RECORD OF THE TWENTY-EIGHTH IEEE PHOTOVOLTAIC SPECIALISTS CONFERENCE - 2000 | 2000年
关键词
D O I
10.1109/PVSC.2000.915860
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
As part of a long-term vision of multi-GW production of photovoltaic (PV) panels per year, First Solar is implementing a plan for 17 KW/hour (similar to 100 MW/year for 3 shifts) production. The research and development of the cells, modules, and manufacturing equipment necessary for this level of production are discussed. A component of this plan is to raise module efficiencies to 10%, with the majority of improvement coming from i) improvement of thin-film uniformity, and ii) reduction of CdS layer thickness while protecting open-circuit voltage with the inclusion of a high-resistivity layer between the TCO and CdS layers. The operation of a new semiconductor deposition system at 2.9 m(2)/min, production throughput, and product quality are also discussed.
引用
收藏
页码:428 / 431
页数:4
相关论文
共 14 条
[1]  
CHU TL, 1983, PROGR PHOTOVOLTAICS, V1, P31
[2]  
GUILINGER J, 1999, ASSESSMENT CRITICAL
[4]  
KROPOSKI B, 1996, 25 IEEE PVSC, P969
[5]  
McCandless BE, 1999, AIP CONF PROC, V462, P182, DOI 10.1063/1.57896
[6]  
MCMASTER A, 2000, 16 NCPV PROGR REV, P101
[7]  
Moskowitz P. D., 1992, International Journal of Solar Energy, V12, P259, DOI 10.1080/01425919208909767
[8]  
POWELL RC, 1998, 15 NCPV PHOT PROGR R, V462, P31
[9]  
POWELL RC, 2000, 16 NCPV PROGR REV, P37
[10]  
SASALA R, 1998, IEEE 1 WORLD C PHOT, V1, P311