共 24 条
[1]
Effect of bicycles on capacity of signalized intersections
[J].
HIGHWAY CAPACITY ISSUES 1998,
1998, (1646)
:87-95
[2]
[Anonymous], 2002, HDB BEM STRASS HBS 2
[3]
Bonneson JA, 2006, TRANSPORT RES REC, P76
[4]
FLOW-RATES AT SIGNALIZED INTERSECTIONS UNDER COLD WINTER CONDITIONS
[J].
JOURNAL OF TRANSPORTATION ENGINEERING-ASCE,
1992, 118 (03)
:439-450
[5]
ESTIMATION OF SATURATION FLOW, EFFECTIVE GREEN TIME AND PASSENGER CAR EQUIVALENTS AT TRAFFIC SIGNALS BY MULTIPLE LINEAR-REGRESSION
[J].
TRANSPORTATION RESEARCH,
1978, 12 (01)
:47-53
[6]
DENNIS J. E., 1996, Numerical Methods for Unconstrained Optimization and Nonlinear Equations
[7]
GILLAM WJ, 1992, IEE CONF PUBL, V355, P85
[8]
Korean Ministry of Construction, 1992, KOR HIGHW CAP MAN
[9]
Maki PJ, 1999, P I TRANSP ENG 1999
[10]
Maze T., 2005, Whether Weather Matters to Traffic Demand and Traffic Flow