Hydrothermal generation scheduling package: A genetic based approach

被引:14
作者
Chang, HC [1 ]
Chen, PH
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Elect Engn, Taipei, Taiwan
[2] St Johns & St Marys Inst Technol, Dept Elect Engn, Tamsui, Taiwan
关键词
hydrothermal generation scheduling; genetic algorithm;
D O I
10.1049/ip-gtd:19981986
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Novel solution algorithms and results based on a genetic algorithm for solving the hydrothermal generation scheduling (HTGS) problem are presented. This is a nonlinear, combinational optimisation problem which aims to minimise the total fuel costs of a power system while satisfying various local and coupling constraints. This results in a complete and efficient HTGS software package for system operation planning needs. In the thermal unit commitment subproblem, the difficult minimal uptime/downtime constraints are embedded and satisfied throughout the proposed encoding and decoding algorithms. Therefore, the global optimum of the problem can be approached with rather high probability. In the hydroelectric scheduling subproblems, complete solution algorithms and encoding/decoding techniques are proposed for solving different types of hydro plants involving hydraulically independent plants (HIPs), hydraulically coupled plants (HCPs), and pump-storage (P/S) plants. In the proposed approach, the hydraulically coupled plants which are located on the same river are solved concurrently. The difficult water balance constraints caused by hydraulic coupling are embedded and satisfied throughout the proposed encoding and decoding algorithm. The software package is applied with great success to the actual Taipower system, which consists of 34 thermal units, two HIPs, three HCPs, and four P/S units.
引用
收藏
页码:451 / 457
页数:7
相关论文
共 12 条
[1]  
[Anonymous], 1991, Handbook of genetic algorithms
[2]   LARGE-SCALE ECONOMIC-DISPATCH BY GENETIC ALGORITHM [J].
CHEN, PH ;
CHANG, HC .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (04) :1919-1926
[3]   Genetic aided scheduling of hydraulically coupled plants in hydro-thermal coordination [J].
Chen, PH ;
Hang, HG .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) :975-981
[4]  
CHEN PH, 1989, THESIS NATL TSING HU
[5]  
ELHAWARY ME, 1991, P 1991 IASTED INT C, P1
[6]  
GOLDBERG DE, 1989, GENETIC ALGORITHM SE
[7]   NONLINEAR APPROXIMATION METHOD IN LAGRANGIAN RELAXATION-BASED ALGORITHMS FOR HYDROTHERMAL SCHEDULING [J].
GUAN, XH ;
LUH, PB ;
ZHANG, L .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (02) :772-778
[8]   IMPLEMENTATION OF GENETIC ALGORITHM FOR DISTRIBUTION-SYSTEMS LOSS MINIMUM RECONFIGURATION [J].
NARA, K ;
DEB, AK ;
SHIOSE, A ;
KITAGAWA, M ;
ISHIHARA, T .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (03) :1044-1051
[9]   A flexible approach to short-term hydro-thermal coordination .1. Problem formulation and general solution procedure - Discussion [J].
Svoboda, AJ ;
Johnson, RB .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (03) :1571-1571
[10]  
SUN DI, 1988, GENERATING UNITS HYD, P1