Performance modeling for contractor selection

被引:63
作者
Alarcón, LF [1 ]
Mourgues, C [1 ]
机构
[1] Catholic Univ Chile, Dept Construct Engn & Management, Escuela Ingn, Santiago, Chile
关键词
D O I
10.1061/(ASCE)0742-597X(2002)18:2(52)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes a contractor selection system that incorporates the contractor's performance prediction as one of the criteria for selection. This research was developed working with an owner organization that was interested in developing a framework for evaluating contractors for future work. A modeling framework, developed in previous research, was used to develop a conceptual model of a project that depicts a causal structure of the variables, risks, and interactions that affect a contractor's performance for a specific project from the owner's point of view. The conceptual model helps to identify information needed for a comprehensive evaluation; some information can be readily available from historical records, while other can be unavailable and can be replaced by estimates based on experience. Ideally, over time, the owner should collect most of the information required for future evaluations. A mathematical component of the model can generate predictions of multiple project performance outcomes for each contractor under evaluation; these predictions and a contractors' bid prices are then used for contractor evaluation purposes.
引用
收藏
页码:52 / 60
页数:9
相关论文
共 23 条
[1]  
AKEL N, 1996, COMPUTER IMPLEMENTAT
[2]  
Alarcon L. F., 2000, ENG CONSTR ARCHIT MA, V7, P63
[3]  
Alarcon L. F., 2000, ASSESSING PROJECT EX
[4]   Modeling project performance for decision making [J].
Alarcon, LF ;
Ashley, DB .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (03) :265-273
[5]  
ALARCON LF, 1997, IDENTIFICATION CRITI, P127
[6]  
ALARCON LF, 2000, REV ING CONSTR, V15, P64
[7]  
[Anonymous], INT J PROJECT MANAGE
[8]   Contractor prequalification in Saudi Arabia [J].
Bubshait, AA ;
AlGobali, KH .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1996, 12 (02) :50-54
[9]   Contractor selection using multicriteria utility theory: An additive model [J].
Hatush, Z ;
Skitmore, M .
BUILDING AND ENVIRONMENT, 1998, 33 (2-3) :105-115
[10]  
Holt G. D., 1998, International Journal of Project Management, V16, P153, DOI 10.1016/S0263-7863(97)00035-5