Probabilistic reserve schedule with demand-side participation

被引:11
作者
Bai, J. [1 ]
Gooi, H. B. [1 ]
Xia, L. M. [1 ]
机构
[1] Nanyang Technol Univ, Power Market Res Grp, Singapore, Singapore
关键词
probabilistic reserve; demand-side participation; risk index; EENS; power market;
D O I
10.1080/15325000701549079
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
A probabilistic reserve model with demand-side participation is proposed in this article. The possible cost of not providing enough energy is taken into account together with the schedule cost. An optimal risk index can be achieved by balancing these two costs via a Lagrangian relaxation based unit commitment (UC) equipped with the golden section search technique. The effect of unit's outage replacement rates (ORR) is considered under different case studies. Simulation results reveal that with the demand-side participation, the total cost, the expected energy not served (EENS) and the reserve cost are reduced significantly. It is also found that EENS increases when ORR increases.
引用
收藏
页码:138 / 151
页数:14
相关论文
共 19 条
[1]  
[Anonymous], FDN OPTIMIZATION
[2]  
Billinton R., 1984, Reliability Evaluation of Power Systems, DOI DOI 10.1007/978-1-4615-7731-7
[3]   Market-clearing with stochastic security - Part II: Case studies [J].
Bouffard, F ;
Galiana, FD ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (04) :1827-1835
[4]   Market-clearing with stochastic security - Part I: Formulation [J].
Bouffard, F ;
Galiana, FD ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (04) :1818-1826
[5]   An electricity market with a probabilistic spinning reserve criterion [J].
Bouffard, F ;
Galiana, FD .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (01) :300-307
[6]  
Chattopadbyay D, 2002, 2002 IEEE POWER ENGINEERING SOCIETY WINTER MEETING, VOLS 1 AND 2, CONFERENCE PROCEEDINGS, P280, DOI 10.1109/PESW.2002.984999
[7]   Reliability and reserve in competitive electricity market scheduling [J].
Flynn, M ;
Sheridan, WP ;
Dillon, JD ;
O'Malley, MJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (01) :78-87
[8]   Optimal scheduling of spinning reserve - Reply [J].
Gooi, HB ;
Mendes, DP ;
Bell, KRW ;
Kirschen, DS .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (04) :1492-1492
[9]   The IEEE reliability test system - 1996 [J].
Grigg, C ;
Wong, P ;
Albrecht, P ;
Allan, R ;
Bhavaraju, M ;
Billinton, R ;
Chen, Q ;
Fong, C ;
Haddad, S ;
Kuruganty, S ;
Li, W ;
Mukerji, R ;
Patton, D ;
Rau, N ;
Reppen, D ;
Schneider, A ;
Shahidehpour, M ;
Singh, C .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) :1010-1018
[10]   Demand-side view of electricity markets [J].
Kirschen, DS .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (02) :520-527