Balancing U-lines in a multiple U-line facility

被引:78
作者
Miltenburg, J [1 ]
机构
[1] McMaster Univ, Michael DeGroote Sch Business, Hamilton, ON L8S 4M4, Canada
关键词
line balancing; just-in-time production systems; dynamic programming; facility design; manufacturing;
D O I
10.1016/S0377-2217(97)00169-0
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
U-shaped production lines and facilities consisting of many such lines are important parts of modern manufacturing systems. The problem of balancing and rebalancing U-line facilities is studied in this paper. Like the traditional line balancing problem this problem is NP-hard. The objective is to assign tasks to a minimum number of regular, crossover, and multiline stations while satisfying cycle time, precedence, location, and station-type constraints. A secondary objective is to concentrate the idle time in one station so that improvement efforts can be focused there in accordance with modem just-in-time principles. A reaching dynamic programming algorithm is presented for determining optimal balances. It is effective for balancing and rebalancing facilities with any number of U-lines, provided that individual U-lines do not have more than 22 tasks and do not have wide, sparse precedence graphs. (C) 1998 Elsevier Science B.V.
引用
收藏
页码:1 / 23
页数:23
相关论文
共 19 条
[1]   A SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM [J].
BAYBARS, I .
MANAGEMENT SCIENCE, 1986, 32 (08) :909-932
[2]   FAST, EFFECTIVE ALGORITHMS FOR SIMPLE ASSEMBLY LINE BALANCING PROBLEMS [J].
HACKMAN, ST ;
MAGAZINE, MJ ;
WEE, TS .
OPERATIONS RESEARCH, 1989, 37 (06) :916-924
[3]  
HALL R, 1983, ZERO INVENTORIES
[4]   EUREKA - A HYBRID SYSTEM FOR ASSEMBLY LINE BALANCING [J].
HOFFMANN, TR .
MANAGEMENT SCIENCE, 1992, 38 (01) :39-47
[5]  
*JAP MAN ASS, 1989, CAN PROD SYST
[6]   OPTIMALLY BALANCING LARGE ASSEMBLY LINES WITH FABLE [J].
JOHNSON, RV .
MANAGEMENT SCIENCE, 1988, 34 (02) :240-253
[7]   ASSEMBLY LINE BALANCING ALGORITHMS - COMPUTATION COMPARISONS [J].
JOHNSON, RV .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1981, 19 (03) :277-287
[8]  
Lawler E. L, 1979, 10679 BW STICHT MATH
[9]   THE U-LINE LINE BALANCING PROBLEM [J].
MILTENBURG, GJ ;
WIJNGAARD, J .
MANAGEMENT SCIENCE, 1994, 40 (10) :1378-1388
[10]  
MILTENBURG GJ, 1994, EXTENSION U LINE BAL