Power system observability;
Phasor Measurement Unit;
Optimal placement;
Binary Particle Swarm Optimization;
D O I:
10.1016/j.ijepes.2010.08.007
中图分类号:
TM [电工技术];
TN [电子技术、通信技术];
学科分类号:
080906 [电磁信息功能材料与结构];
082806 [农业信息与电气工程];
摘要:
This paper presents a novel approach to optimal placement of Phasor Measurement Units (PMUs) for state estimation. At first, an optimal measurement set is determined to achieve full network observability during normal conditions, i.e. no PMU failure or transmission line outage. Then, in order to consider contingency conditions, the derived scheme in normal conditions is modified to maintain network observability after any PMU loss or a single transmission line outage. Observability analysis is carried out using topological observability rules. A new rule is added that can decrease the number of required PMUs for complete system observability. A modified Binary Particle Swarm Optimization (BPSO) algorithm is used as an optimization tool to obtain the minimal number of PMUs and their corresponding locations while satisfying associated constraint. Numerical results on different IEEE test systems are presented to demonstrate the effectiveness of the proposed approach. (C) 2010 Elsevier Ltd. All rights reserved.