Identifying risk factors of BOT for water supply projects

被引:16
作者
Zeng, S. X. [1 ]
Wan, T. W. [1 ]
Tam, C. M. [2 ]
Liu, D.
机构
[1] Shanghai Jiao Tong Univ, Antai Sch Management, Shanghai, Peoples R China
[2] City Univ Hong Kong, Dept Bldg & Construct, Kowloon, Hong Kong, Peoples R China
关键词
risk & probability analysis; water supply;
D O I
10.1680/wama.2008.161.2.73
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In China, urbanisation, industrialisation and increasing population are straining the existing infrastructure facilities, the shortage of which will suffocate economic growth and social development. In order to overcome the 'bottleneck', the Chinese government has explored the mechanism of the build-operation-transfer (BOT) model to encourage infrastructure provisions from the private sector. Using the analytic hierarchy process (AHP) technique, this paper constructs a three-level hierarchy for identifying the critical risk factors for water supply BOT projects in China. By comparing the 28 risk factors, the critical risk factors were short-listed and found to include 'change of taxation policy', 'fluctuation of loan interest rate', 'variation of water resources price', 'fluctuation of foreign exchange rates', 'competitors' and so on. Finally, strategies of risk management were proposed, including risk minimisation, risk transfer, risk allocation and risk retention.
引用
收藏
页码:73 / 81
页数:9
相关论文
共 25 条
  • [1] SYSTEMATIC-RISK MANAGEMENT APPROACH FOR CONSTRUCTION PROJECTS
    ALBAHAR, JF
    CRANDALL, KC
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (03): : 533 - 546
  • [2] Interface management for China's build-operate-transfer projects
    Chan, WT
    Chen, C
    Messner, JI
    Chua, DKH
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (06) : 645 - 655
  • [3] Trends in agent-based computational modeling of macroeconomics
    Chen, SH
    [J]. NEW GENERATION COMPUTING, 2005, 23 (01) : 3 - 11
  • [4] Company and project evaluation model for privately promoted infrastructure projects
    Dias, A
    Ioannou, PG
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1996, 122 (01) : 71 - 82
  • [5] Goodwin P., 1998, Decision Analysis for Management Judgment
  • [6] JAAFARI A, 1990, ASCE, V116, P68
  • [7] Lyons T., 2004, International Journal of Project Management, V22, P51, DOI 10.1016/S0263-7863(03)00005-X
  • [8] Qiao L., 2001, J PROJECT FINANCE, V7, P53, DOI DOI 10.3905/JSF.2001.320244
  • [9] Saaty TL., 1980, The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation
  • [10] Sentürk HA, 2004, J CONSTR ENG M ASCE, V130, P449