Optimal release times in a single server: An optimal control perspective

被引:23
作者
Gazarik, M [1 ]
Wardi, Y [1 ]
机构
[1] Georgia Inst Technol, Sch Elect & Comp Engn, Atlanta, GA 30332 USA
关键词
discrete-event systems; max-plus algebra; optimal control;
D O I
10.1109/9.701110
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper is concerned with the basic structure of optimal control of discrete-event dynamic processes defined over a max-plus algebra. Only a simple system is being considered, namely a single server processing a given sequence of jobs, but the structural conditions that are discovered may lead to extensions to more general systems. The problem in question is how to optimally control the completion (output) times of the jobs by assigning their release (input) times, so as to minimize a measure of the discrepancy between the completion times and given desired due dates. The concept of the costate is being applied to the discrete dynamics to identify structural optimality conditions, and, in the case of quadratic cost measures, the optimal control is shown to be computable by a state-feedback law that is linear in the max-plus-algebra.
引用
收藏
页码:998 / 1002
页数:5
相关论文
共 11 条
[1]  
Athans Michael., 1966, OPTIMAL CONTROL
[2]  
Baccelli F, 1992, SYNCHRONIZATION LINE
[3]  
Bryson A. E., 1975, APPL OPTIMAL CONTROL
[4]   PERTURBATION ANALYSIS FOR THE DESIGN OF FLEXIBLE MANUFACTURING SYSTEM FLOW CONTROLLERS [J].
CARAMANIS, M ;
LIBEROPOULOS, G .
OPERATIONS RESEARCH, 1992, 40 (06) :1107-1125
[5]   ALGEBRAIC TOOLS FOR THE PERFORMANCE EVALUATION OF DISCRETE EVENT SYSTEMS [J].
COHEN, G ;
MOLLER, P ;
QUADRAT, JP ;
VIOT, M .
PROCEEDINGS OF THE IEEE, 1989, 77 (01) :39-58
[6]   GREEDY HEURISTICS FOR SINGLE-MACHINE SCHEDULING PROBLEMS WITH GENERAL EARLINESS AND TARDINESS COSTS [J].
FEDERGRUEN, A ;
MOSHEIOV, G .
OPERATIONS RESEARCH LETTERS, 1994, 16 (04) :199-208
[7]   A REVIEW OF PRODUCTION SCHEDULING [J].
GRAVES, SC .
OPERATIONS RESEARCH, 1981, 29 (04) :646-675
[8]   AN ALGORITHM FOR THE COMPUTER CONTROL OF A FLEXIBLE MANUFACTURING SYSTEM [J].
KIMEMIA, J ;
GERSHWIN, SB .
IIE TRANSACTIONS, 1983, 15 (04) :353-362
[9]   SCHEDULING OF MANUFACTURING SYSTEMS USING THE LAGRANGIAN-RELAXATION TECHNIQUE [J].
LUH, PB ;
HOITOMT, DJ .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1993, 38 (07) :1066-1079
[10]   OPTIMAL-CONTROL OF PULL MANUFACTURING SYSTEMS [J].
PERKINS, JR ;
KUMAR, PR .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1995, 40 (12) :2040-2051