Market price calculations in restructured electricity markets

被引:13
作者
Doorman, G [1 ]
Nygreen, B
机构
[1] SINTEF Energy Res, Trondheim, Norway
[2] Norwegian Univ Sci & Technol, Dept Ind Econ & Technol Management, Trondheim, Norway
关键词
power market; unit commitment; Lagrange relaxation; ancillary services;
D O I
10.1023/B:ANOR.0000004762.31449.33
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In the traditional organisation of the power market, the generation Unit Commitment and Dispatch problem was solved as a cost minimisation problem. After deregulation of the electricity sector, the problem must be solved as a profit maximising problem. It is necessary to find feasible market prices. This is difficult, because simple marginal cost based prices not always cover startup and operation-independent costs, with the result that the generator would choose not to run with such prices. In this paper a market structure is proposed with a central market operator computing the market equilibrium for both energy and reserves, based on generator offers and consumer bids. It is shown that it is possible to find feasible market prices. Using a simple test system, it is shown that demand elasticity can have a profound impact on prices and generator revenues and profits during peaking hours.
引用
收藏
页码:49 / 67
页数:19
相关论文
共 12 条
[1]  
Baldick R., 1995, IEEE T POWER SYSTEMS, V10
[2]  
BARD JF, 1998, OPERATIONS RES, V36
[3]   OPTIMAL SHORT-TERM SCHEDULING OF LARGE-SCALE POWER-SYSTEMS [J].
BERTSEKAS, DP ;
LAUER, GS ;
SANDELL, NR ;
POSBERGH, TA .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1983, 28 (01) :1-11
[4]   Draining the pool: the reform of electricity trading in England and Wales [J].
Green, R .
ENERGY POLICY, 1999, 27 (09) :515-525
[5]  
GREEN R, 2000, P IEEE, V88
[6]  
HUSE ES, 1999, IEEE T POWER SYSTEMS, V14
[7]  
Joskow P.L., 1983, MARKETS POWER ANAL E
[8]  
JOSKOW PL, 1996, IND CORP CHANGE, V2, P241
[9]  
MADRIGAL M, 2000, 2000 IEEE POW ENG SO
[10]  
MERLIN A, 1983, IEEE T PAS PA, V102