A new working stress method for prediction of reinforcement loads in geosynthetic walls

被引:139
作者
Allen, TM
Bathurst, RJ [1 ]
Holtz, RD
Walters, D
Lee, WF
机构
[1] Royal Mil Coll Canada, Dept Civil Engn, Queens RMC, Geoengn Ctr, Kingston, ON K7K 7B4, Canada
[2] Washington State Dept Transportat, State Mat Lab, Olympia, WA 98504 USA
[3] Univ Washington, Dept Civil Engn, Seattle, WA 98195 USA
[4] Queens Univ, Dept Civil Engn, Queens RMC, Geoengn Ctr, Kingston, ON K7L 3N6, Canada
[5] Taiwan Construct Res Inst, Res & Dev Sect, Hsintien City, Taiwan
关键词
geosynthetics; reinforcement; walls; loads; strains; design; K-stiffness method;
D O I
10.1139/T03-051
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Proper estimation of soil reinforcement loads and strains is key to accurate internal stability design of reinforced soil structures. Current design methodologies use limit equilibrium concepts to estimate reinforcement loads for internal stability design of geosynthetic and steel reinforced soil walls. For geosynthetic walls, however, it appears that these methods are excessively conservative based on the performance of geosynthetic walls to date. This paper presents a new method, called the K-stiffness method, that is shown to give more accurate estimates of reinforcement loads, thereby reducing reinforcement quantities and improving the economy of geosynthetic walls. The paper is focused on the new method as it applies to geosynthetic walls constructed with granular (noncohesive, relatively low silt content) backfill soils. A database of 11 full-scale geosynthetic walls was used to develop the new design methodology based on working stress principles. The method considers the stiffness of the various wall components and their influence on reinforcement loads. Results of simple statistical analyses show that the current American Association of State Highway and Transportation Officials (AASHTO) Simplified Method results in an average ratio of measured to predicted loads (bias) of 0.45, with a coefficient of variation (COV) of 91%, whereas the proposed method results in an average bias of 0.99 and a COV of 36%. A principle objective of the method is to design the wall reinforcement so that the soil within the wall backfill is prevented from reaching a state of failure, consistent with the notion of working stress conditions. This concept represents a new approach for internal stability design of geosynthetic-reinforced soil walls because prevention of soil failure as a limit state is considered in addition to the current practice of preventing reinforcement rupture.
引用
收藏
页码:976 / 994
页数:19
相关论文
共 53 条
[1]  
Allen T. M., 2001, 5131 WARD WASH STAT
[2]  
Allen T. M., 1992, P INT S GEOS REINF S, P81
[3]   Observed long-term performance of geosynthetic walls and implications for design [J].
Allen, TM ;
Bathurst, RJ .
GEOSYNTHETICS INTERNATIONAL, 2002, 9 (5-6) :567-606
[4]   Global level of safety and performance of geosynthetic walls: An historical perspective [J].
Allen, TM ;
Bathurst, RJ ;
Berg, RR .
GEOSYNTHETICS INTERNATIONAL, 2002, 9 (5-6) :395-450
[5]   Soil reinforcement loads in geosynthetic walls at working stress conditions [J].
Allen, TM ;
Bathurst, RJ .
GEOSYNTHETICS INTERNATIONAL, 2002, 9 (5-6) :525-566
[6]  
ALLEN TM, 2003, 5222 WARD WASH STAT
[7]  
American Association of State Highway and Transportation Officials (AASHTO), 1996, STAND SPEC HIGHW BRI
[8]  
[Anonymous], 2002, Standard Specifications for Highway Bridges
[9]  
[Anonymous], P INT S EARTH REINF
[10]  
[Anonymous], 1986, P 3 INT C GEOT VIENN