A reliability based maintenance policy; A case study

被引:24
作者
Abdul-Nour, G
Beaudoin, H
Ouellet, P
Rochette, R
Lambert, S
机构
[1] Univ Quebec, Dept Genie Ind, Lab Rech Prod, Trois Rivieres, PQ G9A 5H7, Canada
[2] Aluminerie Lauralco Inc, Quebec City, PQ G0A 1S0, Canada
关键词
maintenance; reliability; FMEA; production system;
D O I
10.1016/S0360-8352(98)00166-1
中图分类号
TP39 [计算机的应用];
学科分类号
081203 [计算机应用技术]; 0835 [软件工程];
摘要
Reliability centered maintenance (RCM) incorporates sound guidance for managers who wish to attain high standards of maintenance at their operating plants. Since the amount and type of maintenance which is applied depend strongly on the machine or components age (DFR, CFR or IFR), on its replacement cost as well as on the cost and safety consequences of system failure, a careful analysis of the system components based on their reliability data should be done in order to optimize the maintenance program. This paper describes the methodology which was used at an aluminum plant in order to select critical machines and to develop an optimal maintenance policy based on reliability data of each machine, safety consequences of system failure, lead time and repair time, and components criticality. (C) 1998 Published by Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:591 / 594
页数:4
相关论文
共 5 条
[1]
ABDULNOUR G, 1993, COMPUTERS IND ENG, V25
[2]
Jardine AK S., 1973, MAINTENANCE REPLACEM
[3]
MCCALL JJ, 1965, MANAGEMENT SCI, V11
[4]
SHERIF VS, 1980, OPTIMUM MAINTENANCE
[5]
STAMATIS DH, 1995, ASQC 1995