The role of the nonanticipativity constraint in commercial software for stochastic project scheduling

被引:14
作者
Fernandez, AA [1 ]
Armacost, RL [1 ]
PetEdwards, JJA [1 ]
机构
[1] UNIV CENT FLORIDA,DEPT IND ENGN & MANAGEMENT SYST,ORLANDO,FL 32816
关键词
project scheduling software; stochastic project scheduling;
D O I
10.1016/0360-8352(96)00119-2
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Recently announced commercial project scheduling products address the stochastic project scheduling problem. Their solution methods do not consider the nonanticipativity constraint and thus provide potentially unattainable solutions to stochastic resource constrained project scheduling problems. The nonanticipativity constraint of multiperiod stochastic problems imposes the requirement that solutions be based only on information known at the time of decisions. Users should use the results from these programs with extreme care.
引用
收藏
页码:233 / 236
页数:4
相关论文
共 7 条
[1]  
Escudero L. F., 1993, Annals of Operations Research, V43, P311
[2]  
FERNANDEZ A, 1996, IN PRESS P 1996 IND
[3]  
Fernandez A.A., 1995, THESIS U CENTRAL FLO
[4]  
Maroto C., 1994, INT T OPER RES, V1, P209, DOI [10.1016/0969-6016(94)90021-3, DOI 10.1016/0969-6016(94)90021-3]
[5]  
*OPERA, 1995, WELC SOFTW TECHN
[6]  
*PAL CORP, 1995, RISK PROJ
[7]  
*SCIT COPR, 1995, PROJ SCH 6 WIND