Unit commitment using hybrid models: a comparative study for dynamic programming, expert system, fuzzy system and genetic algorithms

被引:48
作者
Padhy, NP [1 ]
机构
[1] Univ Roorkee, Dept Elect Engn, Roorkee 247667, Uttar Pradesh, India
关键词
unit commitment; dynamic programming; expert system; fuzzy system; neural network and genetic algorithms;
D O I
10.1016/S0142-0615(00)00090-9
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Hybrid models for solving unit commitment problem have been proposed in this paper. To incorporate the changes due to the addition of new constraints automatically, an expert system (ES) has been proposed. The ES combines both schedules of units to be committed based on any classical or traditional algorithms and the knowledge of experienced power system operators. A solution database, i.e. information contained in the previous schedule is used to facilitate the current solution process. The proposed ES receives the input, i.e. the unit commitment solutions from a fuzzy-neural network. The unit commitment solutions from the artificial neural network cannot offer good performance if the load patterns are dissimilar to those of the trained data. Hence, the load demands, i.e. the input to the fuzzy-neural network is considered as fuzzy variables. To take into account the uncertainty in load demands, a fuzzy decision making approach has also been developed to solve the unit commitment problem and to train the artificial neural network. Due to the mathematical complexity of traditional techniques for solving unit commitment problem and also to facilitate comparison genetic algorithm, a non-traditional optimization technique has also been proposed. To demonstrate the effectiveness of the models proposed, extensive studies have been performed for different power systems consisting of 10, 26 and 34 generating units. The generation cost obtained and the computational time required by the proposed model has been compared with the existing traditional techniques such as dynamic programming (DP), ES, fuzzy system (FS) and genetic algorithms (GA). (C) 2001 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:827 / 836
页数:10
相关论文
共 21 条
[1]  
AHAW JJ, 1995, IEEE T POWER SYST, V10, P1329
[2]   THERMAL UNIT COMMITMENT USING GENETIC ALGORITHMS [J].
DASGUPTA, D ;
MCGREGOR, DR .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1994, 141 (05) :459-465
[3]  
GOLDBERG DE, 1989, GENETIC ALGORITHM SE
[4]  
HEWERS J, 1991, INTRO THEORY NEURAL
[5]   An evolutionary programming solution to the unit commitment problem [J].
Juste, KA ;
Kita, H ;
Tanaka, E ;
Hasegawa, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (04) :1452-1459
[6]  
Lowery PG, 1966, IEEE T POWER APPAR S, VPAS-85, P422
[7]   A NEW METHOD FOR UNIT COMMITMENT AT ELECTRICITE DE FRANCE [J].
MERLIN, A ;
SANDRIN, P .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1983, 102 (05) :1218-1225
[8]   A genetic algorithm for generator scheduling in power systems [J].
Orero, SO ;
Irving, MR .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1996, 18 (01) :19-26
[9]   A HYBRID ARTIFICIAL NEURAL NETWORK-DYNAMIC PROGRAMMING APPROACH TO UNIT COMMITMENT [J].
OUYANG, Z ;
SHAHIDEHPOUR, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (01) :236-242
[10]   SHORT-TERM UNIT COMMITMENT EXPERT SYSTEM [J].
OUYANG, Z ;
SHAHIDEHPOUR, SM .
ELECTRIC POWER SYSTEMS RESEARCH, 1990, 20 (01) :1-13