共 17 条
[1]
CASSIDY MJ, 1992, P TRB 71 ANN M TRANS
[2]
DUDEK CL, 1986, TRANSPORT RES REC, V1086, P20
[3]
Fazio J., 1988, TRANSPORT RES REC, P4
[4]
JANSON BN, 1987, TRANSPORT RES REC, V1132, P34
[5]
KRAMMES RA, 1994, P TRB 73 ANN M TRANS
[6]
Delay estimation and optimal length for four-lane divided freeway workzones
[J].
JOURNAL OF TRANSPORTATION ENGINEERING-ASCE,
1996, 122 (02)
:114-122
[7]
MCCOY PT, 1980, P TRB 73 ANN M TRANS, V770, P20
[8]
MCCOY PT, 1987, TRANSP RES REC TRANS, V1163, P15
[9]
MEMMOTT JL, 1984, TRANSPORT RES REC, V979, P12
[10]
PAIN RF, 1981, 236 NCHRP TRANSP RES