A two-echelon inventory optimization model with demand time window considerations

被引:26
作者
Jaruphongsa, W
Çetinkaya, S
Lee, CY [1 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Ind Engn & Engn Management, Kowloon, Hong Kong, Peoples R China
[2] Natl Univ Singapore, Dept Ind & Syst Engn, Singapore 117548, Singapore
[3] Texas A&M Univ, Dept Ind Engn, College Stn, TX 77843 USA
基金
美国国家科学基金会;
关键词
demand time-window; dynamic programming; lot-sizing;
D O I
10.1007/s10898-004-6092-y
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper studies a two-echelon dynamic lot-sizing model with demand time windows and early and late delivery penalties. The problem is motivated by third-party logistics and vendor managed inventory applications in the computer industry where delivery time windows are typically specified under a time definite delivery contract. Studying the optimality properties of the problem, the paper provides polynomial time algorithms that require O(T-3) Computational complexity if backlogging is not allowed and O(T-5) computational complexity if backlogging is allowed.
引用
收藏
页码:347 / 366
页数:20
相关论文
共 33 条
[1]   IMPROVED ALGORITHMS FOR ECONOMIC LOT-SIZE PROBLEMS [J].
AGGARWAL, A ;
PARK, JK .
OPERATIONS RESEARCH, 1993, 41 (03) :549-571
[2]   COMPUTATIONAL-COMPLEXITY OF THE CAPACITATED LOT SIZE PROBLEM [J].
BITRAN, GR ;
YANASSE, HH .
MANAGEMENT SCIENCE, 1982, 28 (10) :1174-1186
[3]   APPROXIMATION METHODS FOR THE UNCAPACITATED DYNAMIC LOT SIZE PROBLEM [J].
BITRAN, GR ;
MAGNANTI, TL ;
YANASSE, HH .
MANAGEMENT SCIENCE, 1984, 30 (09) :1121-1140
[4]   IMPROVED HEURISTICS FOR MULTISTAGE REQUIREMENTS PLANNING SYSTEMS [J].
BLACKBURN, JD ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1982, 28 (01) :44-56
[5]  
BRAMEL J, 1997, LOGICS LOGISTICS
[6]   Stock replenishment and shipment scheduling for vendor-managed inventory systems [J].
Çetinkaya, S ;
Lee, CY .
MANAGEMENT SCIENCE, 2000, 46 (02) :217-232
[7]   A NEW DYNAMIC-PROGRAMMING ALGORITHM FOR THE SINGLE ITEM CAPACITATED DYNAMIC LOT-SIZE MODEL [J].
CHEN, HD ;
HEARN, DW ;
LEE, CY .
JOURNAL OF GLOBAL OPTIMIZATION, 1994, 4 (03) :285-300
[8]  
CHENG TCE, 1988, COMPUTERS OPERATIONS, V15, P420
[9]   AN O(T2) ALGORITHM FOR THE NI/G/NI/ND CAPACITATED LOT SIZE PROBLEM [J].
CHUNG, CS ;
LIN, CHM .
MANAGEMENT SCIENCE, 1988, 34 (03) :420-426
[10]   DYNAMIC LOT SIZE MODELS FOR MULTI-STAGE ASSEMBLY SYSTEMS [J].
CROWSTON, WB ;
WAGNER, MH .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01) :14-21