Analysis of the integrated performance and redundant energy of CCHP systems under different operation strategies

被引:81
作者
Li, Longxi [1 ]
Mu, Hailin [1 ]
Li, Nan [1 ]
Li, Miao [1 ]
机构
[1] Dalian Univ Technol, Sch Energy & Power Engn, Dalian 116023, Peoples R China
基金
中国国家自然科学基金;
关键词
Operation strategies; CCHP systems; Integrated performance; Redundant energy; POWER-SYSTEM; CHP SYSTEMS; OPTIMIZATION; LOAD; BUILDINGS; CAPACITY; MODEL;
D O I
10.1016/j.enbuild.2015.04.030
中图分类号
TU [建筑科学];
学科分类号
081407 [建筑环境与能源工程];
摘要
Operation strategy is one of the critical factors that can affect the energy saving, economic, and environmental performance of a combined cooling, heating, and power (CCHP) system. This study models a CCHP system to investigate its annual total cost reduction, primary energy saving, and carbon dioxide emission reduction with respect to a reference system under five different operation strategies as follows: following the electric load (FEL), following the thermal load, following a hybrid electric-thermal load, following the seasonal operation strategy, and following the electric-thermal load of buildings (FLB). All the different operation strategies were optimized considering the part-load conditions for office and residential buildings in Dalian, China. The results indicate that the FLB and FEL yielded better performance than the other strategies. Furthermore, the redundant electricity and heat generated by CCHP systems were analyzed. The CCHP system operating under the strategies that produce less redundant electricity or heat may not yield better performance. However, the CCHP system operating under the strategies that produce huge redundant energy may achieve good integrated performance. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:231 / 242
页数:12
相关论文
共 28 条
[1]
CHO H, 2008, ASME P EN SUST JACKS
[2]
Evaluation of CCHP systems performance based on operational cost, primary energy consumption, and carbon dioxide emission by utilizing an optimal operation scheme [J].
Cho, Heejin ;
Mago, Pedro J. ;
Luck, Rogelio ;
Chamra, Louay M. .
APPLIED ENERGY, 2009, 86 (12) :2540-2549
[3]
Sizing the prime mover of a residential micro-combined cooling heating and power (CCHP) system by multi-criteria sizing method for different climates [J].
Ebrahimi, Masood ;
Keshavarz, Ali .
ENERGY, 2013, 54 :291-301
[4]
The optimal selection of on-site CHP systems through integrated sizing and operational strategy [J].
Ghadimi, P. ;
Kara, S. ;
Kornfeld, B. .
APPLIED ENERGY, 2014, 126 :38-46
[5]
Analysis of combined cooling, heating, and power systems under a compromised electric-thermal load strategy [J].
Han, Gang ;
You, Shijun ;
Ye, Tianzhen ;
Sun, Peng ;
Zhang, Huan .
ENERGY AND BUILDINGS, 2014, 84 :586-594
[6]
Heejin Cho, 2009, ASME 2009 3 INT C EN, P81
[7]
A probability constrained multi-objective optimization model for CCHP system operation decision support [J].
Hu, Mengqi ;
Cho, Heejin .
APPLIED ENERGY, 2014, 116 :230-242
[8]
JIANGJIANG W, 2010, APPL ENERG, V87, P1247, DOI DOI 10.1016/1
[9]
Life cycle assessment of a solar combined cooling heating and power system in different operation strategies [J].
Jing, You-Yin ;
Bai, He ;
Wang, Jiang-Jiang ;
Liu, Lei .
APPLIED ENERGY, 2012, 92 :843-853
[10]
Tri-generation systems: Energy policies, prime movers, cooling technologies, configurations and operation strategies [J].
Jradi, M. ;
Riffat, S. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2014, 32 :396-415