Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling

被引:45
作者
Franck, B [1 ]
Neumann, K [1 ]
Schwindt, C [1 ]
机构
[1] Univ Karlsruhe, Inst Wirtschaftstheorie & Operat Res, D-76128 Karlsruhe, Germany
关键词
resource-constrained project scheduling truncated branch-and-bound; priority-rule methods; tabu search; genetic algorithms;
D O I
10.1007/PL00013356
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We present heuristic procedures for approximately solving large project scheduling problems with general temporal and resource constraints. In particular, we propose several truncated branch-and-bound techniques. priority-rule methods. and schedule-improvement procedures of types tabu search and genetic algorithm. A detailed experimental performance analysis compares the different heuristics devised and shows that large problem instances with up to 1000 activities and several resources can efficiently be solved with sufficient accuracy.
引用
收藏
页码:297 / 324
页数:28
相关论文
共 30 条
[1]  
[Anonymous], 1996, J DECIS SYST
[2]  
Baar T., 1998, METAHEURISTICS ADV T, P1
[3]   Satisfiability tests and time-bound adjustments for cumulative scheduling problems [J].
Baptiste, P ;
Le Pape, C ;
Nuijten, W .
ANNALS OF OPERATIONS RESEARCH, 1999, 92 (0) :305-333
[4]  
Bartusch M., 1988, Annals of Operations Research, V16, P201
[5]  
Bean J. C., 1994, ORSA Journal on Computing, V6, P154, DOI 10.1287/ijoc.6.2.154
[6]   A branch and bound algorithm for the resource-constrained project scheduling problem [J].
Brucker, P ;
Knust, S ;
Schoo, A ;
Thiele, O .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) :272-288
[7]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[8]   AN ALGORITHM FOR SOLVING THE JOB-SHOP PROBLEM [J].
CARLIER, J ;
PINSON, E .
MANAGEMENT SCIENCE, 1989, 35 (02) :164-176
[9]   A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations [J].
De Reyck, B ;
Herroelen, W .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 111 (01) :152-174
[10]   A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM [J].
DEMEULEMEESTER, E ;
HERROELEN, W .
MANAGEMENT SCIENCE, 1992, 38 (12) :1803-1818