Use of experience curves to estimate the future cost of power plants with CO2 capture

被引:221
作者
Rubin, Edward S. [1 ]
Yeh, Sonia [2 ]
Antes, Matt [3 ]
Berkenpas, Michael [1 ]
Davison, John [4 ]
机构
[1] Carnegie Mellon Univ, Dept Engn & Publ Policy, Pittsburgh, PA 15213 USA
[2] Univ N Carolina, Ctr Urban & Reg Studies, Chapel Hill, NC USA
[3] Energetics Inc, Columbia, MD USA
[4] IEA Greenhouse Gas R&D Programme, Cheltenham, Glos, England
关键词
CO2; capture; cost estimates; experience curves; technology innovation; PC plants; IGCC plants; NGCC plants; oxyfuel plants;
D O I
10.1016/S1750-5836(07)00016-3
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Given the dominance of power plant emissions of greenhouse gases, and the growing worldwide interest in CO2 capture and storage (CCS) as a potential climate change mitigation option, the expected future cost of power plants with CO2 capture is of significant interest. Reductions in the cost of technologies as a result of learning-by-doing, R&D investments and other factors have been observed over many decades. This study uses historical experience curves as the basis for estimating future cost trends for four types of electric power plants equipped with CO2 capture systems: pulverized coal (PC) and natural gas combined cycle (NGCC) plants with post-combustion CO2 capture; coal-based integrated gasification combined cycle (IGCC) plants with pre-combustion capture; and coal-fired oxyfuel combustion for new PC plants. We first assess the rates of cost reductions achieved by other energy and environmental process technologies in the past. Then, by analogy with leading capture plant designs, we estimate future cost reductions that might be achieved by power plants employing CO2 capture. Effects of uncertainties in key parameters on projected cost reductions also are evaluated via sensitivity analysis. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:188 / 197
页数:10
相关论文
共 15 条
[1]   LEARNING-CURVES IN MANUFACTURING [J].
ARGOTE, L ;
EPPLE, D .
SCIENCE, 1990, 247 (4945) :920-924
[2]  
Boston Consulting Group. Inc, 1968, PERSP EXP
[3]   The economics of the combined cycle gas turbine - an experience curve analysis [J].
Colpier, UC ;
Cornland, D .
ENERGY POLICY, 2002, 30 (04) :309-316
[4]  
*IECM, 2005, CTR EN ENV STUD
[5]   Learning rates for energy technologies [J].
McDonald, A ;
Schrattenholzer, L .
ENERGY POLICY, 2001, 29 (04) :255-261
[6]  
Merrow E. W., 1988, Understanding the Outcomes of Megaprojects: A Quantitative Analysis of Very Large Civilian Projects
[7]  
Metz B., 2005, SPECIAL REPORT CARBO
[8]  
Mowery D., 2003, US TECHNOLOGY INNOVA
[9]   Technological learning for carbon capture and sequestration technologies [J].
Riahi, K ;
Rubin, ES ;
Taylor, MR ;
Schrattenholzer, L ;
Hounshell, D .
ENERGY ECONOMICS, 2004, 26 (04) :539-564
[10]  
Rubin E. S., 2004, International Journal of Energy Technology and Policy, V2, P52, DOI 10.1504/IJETP.2004.004587