Cost estimation of the canisters for an HLW repository in Korea

被引:8
作者
Kim, S. K. [1 ]
Chun, K. S. [1 ]
Choi, H. J. [1 ]
Choi, J. W. [1 ]
Kwak, Tai-Wan [2 ]
机构
[1] Korea Atom Energy Res Inst, Taejon 305353, South Korea
[2] Chungnam Natl Univ, Taejon 305764, South Korea
关键词
canister; manufacturing cost; spent fuel; repository; cost driver;
D O I
10.1016/j.pnucene.2007.08.010
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 [核科学与技术]; 082701 [核能科学与工程];
摘要
This study provides the estimated costs for the canisters of PWR and CANDU spent fuels based on an industrial engineering method and the account classification method. Ceteris paribus, it is found that approximately 13% of the unit manufacturing cost based oil an industrial engineering estimation was cheaper than that of the account classification method. The unit manufacturing cost of a PWR canister was estimated to be 163,586 EUR by using an industrial engineering estimation. According to the conceptual Korean reference design, for the PWR, 11,375 canisters and for the CANDU, 2835 canisters will be needed to dispose of the spent fuels of 36,000 tU, so the manufacturing costs of the canisters would be about 32% of the total disposal cost. Hence, the manufacturing cost of the canisters for spent fuels is the most dominant cost driver for the overall disposal costs. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:555 / 566
页数:12
相关论文
共 13 条
[1]
Chemical and biological considerations in the treatment of metal Intoxications by Chelating agents [J].
Andersen, O .
MINI-REVIEWS IN MEDICINAL CHEMISTRY, 2004, 4 (01) :11-21
[2]
ANDERSON CG, 2002, SKBTR0207, P19
[3]
CHOI J, 1999, J KOREAN NUCL SOC, V31, P83
[4]
CHOI JW, 2005, KAERITR2936, P8
[5]
CHOI JW, 2005, KAERITR3063, P20
[6]
HOMGREN CT, 1994, COST ACCOUNTING MANA, P47
[7]
A comparison of the HLW underground repository cost for the vertical and horizontal emplacement options in Korea [J].
Kim, S. K. ;
Lee, Y. ;
Choi, W. ;
Hahn, P. S. ;
Kwak, Tai-Wan .
PROGRESS IN NUCLEAR ENERGY, 2007, 49 (01) :79-92
[8]
KIM SS, 2000, KAERTTR2172, P65
[9]
KUKKOLA, 2005, COST ESTIMATE OLKILU, P36
[10]
LEE CW, 2003, COST MANAGERIAL ACCO, P58