Optimal DG placement in deregulated electricity market

被引:163
作者
Gautam, Durga [1 ]
Mithulananthan, Nadarajah [1 ]
机构
[1] Asian Inst Technol, Energy Field Study, Klongluang 12120, Pathumthani, Thailand
关键词
distributed generation; locational marginal price; optimal power flow; electricity market; social welfare;
D O I
10.1016/j.epsr.2006.11.014
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents two new methodologies for optimal placement of distributed generation (DG) in an optimal power flow (OPF) based wholesale electricity market. DG is assumed to participate in real time wholesale electricity market. The problem of optimal placement, including size, is formulated for two different objectives, namely, social welfare maximization and profit maximization. The candidate locations for DG placement are identified on the basis of locational marginal price (LMP). Obtained as lagrangian multiplier associated with active power flow equation for each node, LMP gives the short run marginal cost (SRMC) of electricity. Consumer payment, evaluated as a product of LMP and load at each load bus, is proposed as another ranking to identify candidate nodes for DG placement. The proposed rankings bridges engineering aspects of system operation and economic aspects of market operation and act as good indicators for the placement of DG, especially in a market environment. In order to provide a scenario of variety of DGs available in the market, several cost characteristics are assumed. For each DG cost characteristic, an optimal placement and size is identified for each of the objectives. The proposed methodology is tested in a modified IEEE 14 bus test system. (C) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:1627 / 1636
页数:10
相关论文
共 13 条
[1]  
Agalgaonkar P., 2004, INT J EMERG ELECT PO, V1
[2]  
[Anonymous], P 33 HAW INT C SYST
[3]  
Barker PP, 2000, 2000 IEEE POWER ENGINEERING SOCIETY SUMMER MEETING, CONFERENCE PROCEEDINGS, VOLS 1-4, P1645, DOI 10.1109/PESS.2000.868775
[4]   Optimal distributed generation allocation in MV distribution networks [J].
Celli, G ;
Pilo, F .
PICA 2001: 22ND IEEE POWER ENGINEERING SOCIETY INTERNATIONAL CONFERENCE ON POWER INDUSTRY COMPUTER APPLICATIONS, 2001, :81-86
[5]  
CELLI G, 2002, IEEE P POW SYST C CL
[6]   Optimal investment planning for distributed generation in a competitive electricity market [J].
El-Khattam, W ;
Bhattacharya, K ;
Hegazy, Y ;
Salama, MMA .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (03) :1674-1684
[7]  
Mithulananthan N., 2004, THAMMASAT INT J SCI, V9, P56
[8]   Implications of on-site distributed generation for commercial/industrial facilities [J].
Pipattanasomporn, M ;
Willingham, M ;
Rahman, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (01) :206-212
[9]   OPTIMUM LOCATION OF RESOURCES IN DISTRIBUTED PLANNING [J].
RAU, NS ;
WAN, YH .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (04) :2014-2020
[10]  
Rosehart W., 2002, 14 PSCC SEV 24 28 JU