An economic dispatch model incorporating wind power

被引:796
作者
Hetzer, John [1 ]
Yu, David C. [1 ]
Bhattarai, Kalu [1 ]
机构
[1] Univ Wisconsin, Dept Elect Engn & Comp Sci, Milwaukee, WI 53211 USA
关键词
economic dispatch; penalty cost; reserve cost; Weibull probability density function; wind energy;
D O I
10.1109/TEC.2007.914171
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In solving the electrical power systems economic dispatch (ED) problem, the goal is to find the optimal allocation of output power among the various generators available to serve the system load. With the continuing search for alternatives to conventional energy sources, it is necessary to include wind energy conversion system (WECS) generators in the ED problem. This paper develops a model to include the WECS in the ED problem, and in addition to the classic economic dispatch factors, factors to account for both overestimation and underestimation of available wind power are included. With the stochastic wind speed characterization based on the Weibull probability density function, the optimization problem is numerically solved for a scenario involving two conventional and two wind-powered generators. Optimal solutions are presented for various values of the input parameters, and these solutions demonstrate that the allocation of system generation capacity may be influenced by multipliers related to the risk of overestimation and to the cost of underestimation of available wind power.
引用
收藏
页码:603 / 611
页数:9
相关论文
共 18 条
  • [1] GENETIC ALGORITHM SOLUTION TO THE ECONOMIC-DISPATCH PROBLEM
    BAKIRTZIS, A
    PETRIDIS, V
    KAZARLIS, S
    [J]. IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1994, 141 (04) : 377 - 382
  • [2] BROWN BG, 1984, J CLIM APPL METEOROL, V23, P1184, DOI 10.1175/1520-0450(1984)023<1184:TSMTSA>2.0.CO
  • [3] 2
  • [4] Simulated annealing-based optimal wind-thermal coordination scheduling
    Chen, C. L.
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2007, 1 (03) : 447 - 455
  • [5] Optimal wind-thermal coordination dispatch in isolated power systems with large integration of wind capacity
    Chen, Chun-Lung
    Lee, Tsung-Ying
    Jan, Rong-Mow
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2006, 47 (18-19) : 3456 - 3472
  • [6] A fuzzy model for wind speed prediction and power generation in wind parks using spatial correlation
    Damousis, IG
    Alexiadis, MC
    Theocharis, JB
    Dokopoulos, PS
    [J]. IEEE TRANSACTIONS ON ENERGY CONVERSION, 2004, 19 (02) : 352 - 361
  • [7] Grainger J. J., 1994, Power System Analysis, V1st
  • [8] JUSTUS CG, 1978, J APPL METEOROL, V17, P350, DOI 10.1175/1520-0450(1978)017<0350:MFEWSF>2.0.CO
  • [9] 2
  • [10] Using neural networks to estimate wind turbine power generation
    Li, SH
    Wunsch, DC
    O'Hair, EA
    Giesselmann, MG
    [J]. IEEE TRANSACTIONS ON ENERGY CONVERSION, 2001, 16 (03) : 276 - 282