共 13 条
[2]
Goldratt E.M., 1984, GOAL
[3]
GOLDRATT EM, 1998, INT J PROD RES, V26, P429
[4]
Using the theory of constraints' production application in a semiconductor fab with a reentrant bottleneck
[J].
TWENTY THIRD IEEE/CPMT INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY SYMPOSIUM,
1998,
:352-357
[5]
Myers R. H., 1995, Response Surface Methodology: Process and Product Optimization Using Designed Experiments, DOI DOI 10.2307/1270613
[6]
Ovacik I. M., 1992, Journal of Electronics Manufacturing, V2, P119, DOI 10.1142/S0960313192000157
[10]
*STAT EAS, 1997, DES EXP VERS 5 0 8

