Capacity-constrained scheduling for a logic IC final test facility

被引:30
作者
Lin, JT
Wang, FK [1 ]
Lee, WT
机构
[1] Natl Taipei Univ Technol, Dept Ind Engn & Management, Taipei 106, Taiwan
[2] Natl Tsing Hua Univ, Dept Ind Engn & Engn Management, Hsinchu 300, Taiwan
关键词
D O I
10.1080/0020754032000123588
中图分类号
T [工业技术];
学科分类号
08 [工学];
摘要
A capacity-constrained scheduling using the concept of the theory of constraints for a semiconductor Logic IC final test operation is presented. The scheduling of the IC final test considers unrelated parallel machines with multiple constraint problems. A broad product mix, variable lot sizes and yields, long and variable set-up times, as well as limited test equipment capacity characterize the operations in this test facility. Discrete event simulation models based on e -M-Plant(TM) are developed to implement the capacity-constrained scheduling algorithm. A comparison is also made with other rules, which are combinations of the rules such as first come first serve and earliest due date for the order scheduling, and the rules such as minimum set-up time, shortest processing time and shortest set-up time plus processing time for the dispatching test equipment. The simulation results show that the proposed capacity-constrained scheduling outperforms other rules for the committed volume performance in many different operational conditions. Directions for future research are also presented.
引用
收藏
页码:79 / 99
页数:21
相关论文
共 13 条
[1]
Parallel machine scheduling with release time and machine eligibility restrictions [J].
Centeno, G ;
Armacost, RL .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (1-2) :273-276
[2]
Goldratt E.M., 1984, GOAL
[3]
GOLDRATT EM, 1998, INT J PROD RES, V26, P429
[4]
Using the theory of constraints' production application in a semiconductor fab with a reentrant bottleneck [J].
Kayton, D .
TWENTY THIRD IEEE/CPMT INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY SYMPOSIUM, 1998, :352-357
[5]
Myers R. H., 1995, Response Surface Methodology: Process and Product Optimization Using Designed Experiments, DOI DOI 10.2307/1270613
[6]
Ovacik I. M., 1992, Journal of Electronics Manufacturing, V2, P119, DOI 10.1142/S0960313192000157
[7]
ROLLING HORIZON ALGORITHMS FOR A SINGLE-MACHINE DYNAMIC SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES [J].
OVACIK, IM ;
UZSOY, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (06) :1243-1263
[8]
ROLLING HORIZON PROCEDURES FOR DYNAMIC PARALLEL MACHINE SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES [J].
OVACIK, IM ;
UZSOY, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (11) :3173-3192
[9]
A local search heuristic for unrelated parallel machine scheduling with efficient neighborhood search [J].
Piersma, N ;
vanDijk, W .
MATHEMATICAL AND COMPUTER MODELLING, 1996, 24 (09) :11-19
[10]
*STAT EAS, 1997, DES EXP VERS 5 0 8