Success has always been the ultimate goal of every activity, and a construction project is no exception. Due to the ambiguous definition of project success and the different perceptions of participants toward this concept, it may be difficult to tell whether a project is successful as there is a lack of consensus. Time, cost, and quality have long been the success criteria used to evaluate the performance of a construction project. However, such a list has been criticized as not being comprehensive. Even studies of the project success of a particular construction method, such as the design/build procurement system, are lacking in most previous research considering construction projects in general. This paper sets out to establish criteria for project success for a design/build project in construction, first by identifying relevant measures of project success for a construction project in past studies, with particular emphasis on design/build projects, and then by establishing a comprehensive assessment framework for project success for design/build projects. The significant impacts on the construction field of study, in terms of educational value and practical use, are also presented. With little research in the project success of design/build projects, the writers suggest a research focus for the study.
引用
收藏
页码:120 / 128
页数:9
相关论文
共 48 条
[1]  
Akintoye A, 1994, Construction Management and Economics, V12, P155, DOI 10.1080/01446199400000021
[2]   TEAM-BUILDING PROCESS - KEY TO BETTER PROJECT RESULTS [J].
ALBANESE, R .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1994, 10 (06) :36-44
[3]  
ALMESHEKEH HS, 1999, J CONSTRUCTION PROCU, V5, P58
[4]  
[Anonymous], ENG CONSTRUCTION ARC
[5]  
[Anonymous], 2000, CONSTR MANAG ECON
[6]  
[Anonymous], DESIGN BUILD ACTION
[7]  
Atkinson R., 1999, INT J PROJ MANAG, V17, P337, DOI [DOI 10.1016/S0263-7863(98)00069-6, 10.1016/S0263-7863(98)00069-6]
[8]  
Brown A., 2000, INT J PROJ MANAG, V18, P327, DOI DOI 10.1016/S0263-7863(99)00026-5
[9]  
Bubshait A., 1994, INT J PROJ MANAG, V12, P133, DOI [10.1016/0263-7863(94)90027-2, DOI 10.1016/0263-7863(94)90027-2]
[10]  
CHAN APC, 2000, RES MONOGRAPH EVALUA